What the record showsUAP Docket

Source Library · SRC-117 · Contemporaneous government document

Malmstrom AFB 1967 declassified unit histories

USAF 341st Strategic Missile Wing, archived by The Black Vault · 1967; FOIA release

Malmstrom AFB 1967 declassified unit histories · 88 pages · PDF 15.1 MB

US federal government record (USAF unit histories, declassified; Black Vault copy). Public domain; hosted here so it can be read and searched. Original source ↗

Download PDF

Loading the page…

Text (88 pages)

The text of 22 scanned pages is imperfect. It was produced by machine OCR (PDF text layer; Windows.Media.Ocr (en-US) for the 22 scanned pages). Words are misread, redaction marks read as letters, and handwriting is mostly lost; 1 of 22 scanned pages gave little or no usable text. Use it to find a page, then quote from the page image, not from this text.

Show the text of all 88 pages

Page 1

THIS FILE IS MAOE AVAILABLE THROUGH THE DECLASSIFICATION EFFORTS ANO RESEARCH OF:
TFE BLACK VAULT
THE BLACK VAULT •S THE LARGEST ONLINE FREEDOM OF INFORMATION ACT / GOVERNMENT
RECORD CLEARING HOUSE IN THE WORLD. THE RESEARCH EFFORTS HERE ARE RESPONSIBLE
FOR THE DECLASSIFICATION OF THOUSANDS OF DOCUMENTS THROUGHOUT THE U.S. GOVERNMENT,
ANO ALL CAN BE DOWNLOADED BY VISITING:
HTTPMWWW. BLACKVAULT.COM
YOU ARE ENCOURAGED TO FORWARD THIS DOCUMENT TO YOUR FRIENDS, BUT
PLEASE KEEP THIS IDENTIFYING IMAGE AT THE TOP OF THE
-POF SO OTHERS CAN DOWNLOAD MORE!

Page 2

Wednesday, May 09, 2001
John Greenewa!d, Jr.


FOIA Offica
341 CS/SCBR
30 731d Street North
Malmstrom AF8 fl.ofT 59402~7513
Dear Sir;
This is 2 non-eommercial Freedom of Information Ad request 5 U.S.C. § 552. My fee status
category is -AU Other", and I agree to pay only up to fineen dollars for the requested material.
a
All documents pertaining to a March 16, 1967 incident, in which there was a maljundion
of missile silos at your installation. Please include all documentation of procadures after
this incident occurred, the possible cause, procedures on how to handle the situation etc.
a
Please include documents, letters, tapes, audio and video tapes, memos, and all other
fonns of written and visual media.
a
Also include all documents on one of the personnel there getting injured that same day,
or around this dats.
Thank you very much for your time, and I look forward to your response.
Enclosures:
None

Page 3

DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 341ST SPACE WING (AFSPC)
14 June 2001
341 CS/SCBR (FOIA)
30 73d Street North
Malmstrom AFB MT 59402-7513
Mr. John Greenewald, Jr.

Dear Greenewald
On 18 May 2001 , we received your Freedom of Information Act (FOIA) request dated
9 May 2001, for records pertaining to a March 16, 1967 incident, in which there was a
malfunction of missile silos. Copies of excerpts, as well as supporting documents, of
the below listed documents are releasable and are attached:
a. 341st Strategic Missile Wing History (1 Jan - 31 Mar 1967)
b. 341 st Strategic Missile Wing History (1 Apr - 30 Jun 1967)
c.
341 st Strategic Missile Wing History (1 Jul - 30 Sep 1967)
d.
341st Strategic Missile Wing History (1 Oct - 31 Dec 1967)
e. 341st Strategic Missile Wing History (1 Jan - 31 Mar 1968)
We do not have any audio or video tapes, or documents of any personnel injured. If
you are pursuing your inquiry further, you may wish to contact the National Archives
and Records Administration (NARA) at:
NARA FOIA Officer
National Archives at College Park
8601 Adelphi Road, Room 4400
College Park MD 20740-6001
Web Site: www.nara.gov/foia
Guardians of the HIgh Frontier

Page 4

The FOIA provides for the collection of fees based on the costs of processing a FOIA
request and your fee category. We have placed you in the ·other category"; however,
in this case, we have waived collecting fees.
Sincerely
MARTY S. STEPHENS
Freedom of Information Act Manager
Attachments
1. 341SMW History Excerpts, 1 Jan-31 Mar67 (25 pgs)
2. 341SMW History Excerpts, 1 Apr-30 Jun 67 (15 pgs)
3. 341SMW History Excerpts, 1 Jul- 30 Sep 67 (29 pgs)
4. 341SMW History Excerpts, 1 Oct - 31 Dec 67 (8 pgs)
5. 341SMW History Excerpts, 1 Jan - 31 Mar 68 (7 pgs)

Page 5

~'. ······r
"'--­
.t-. ..
):. <.
'.
i.:"' '.. ';
/:}' :.'
r.:
: 'j'
;'. "
~ .. ­
341st ST;1A~IC 11ISSILE WIN~--____
A11D JUst COII:;;,T SUPPORT ofieu?
fi Q ::AC ,OXIH 57,f8/'5
•
ff')C1~:fit>Title)
c.~ t.'b io-'I!r 1967
~ -:-...::.:,::' '.
,.
Assigned to the
FmE~ :-IlH AIR FORC=; , STil..-\'IT..f.IC AIR COi'2-l.ri.7Plj
• '"
"sf IlJ
Permanently Stationed at
1
I ~?
" If §
l'AL~;STRO!i AIR FORCE R!;'SE, G?2:AT FALLS, !.jCINTANA
t;
,,
,.
..,
y
I
I
J
,
-----.,j
" ,
This docu::-~en ... 'as prepared by A2C Da' .
. G2.t.1b1e, ";1ng .H.1s­
.:.orian under t:,e supe
. 'on of the 1-"
g Infori!'.ation Officer.
It
is prepared in compliance ~
A R 210-1, 29 June 1964, and is class­
ified SEGET under" the
sio
f AFR 20$-1 as amended .
The
classification is
.uired .for the
reveals the ;;..; _ tary capability and
APPROVED :
~
··R}:iAN 1 .
Chief,
COPY (/ )
~d:7-r27jJQ
e._~J., Capt,
Ar
Infor;;:e.tion Division
r"
) •. •,..,,
"'-
i~ : It. d7£!
tection of information that
tional status of the Hing. (U)

Page 6

,.. :
SECURITY STA'IE!-Z!lT PAGE
Yolu::-,e is classified SECRET to confor-m to the classifi..
the ini'orr.'.2.tion in the source docur.lcnts .
It ...'ill be
handled
ccordance Hith the provisions of .A.FR/OS- l, as amended .
This volw
contains inforc~tion effect~the nati onal
defense of the Un~ ed States "'ithin the :ne ~ng of the Espionage
La..s (Title 18, U .• S .
sections 793
transmission
or revelation of which
any unauthorized person is
prohibited by 1.0.-.... .
This volu~e has
downgrading Group 3, fthich is
the highest c.o·"ngrading
to the information in the
source documents.
vsis and consolidation of
information fro;:;. man: sources, which in,h -;duzlly may have lOKer
results in a synthesi
implications
~atf:rial on 'I-.'hich it is
~d.. Therefore,
individual
for e.J.ch paragr~ are not
this voluUie ;,,-111 be handled under
dOimgrading group .

Page 7

)2
."
....
Project How Nov (Service Star), the te:sting of Mark 5 re­
entry vehicles by higher headquarters for ~frectiveness .
Y2~trom
sent the last vehicle in the program for the base during the quarter.
58
This  ended the program at Malmstrom.
(U)
A ...-alk- thru inspection of tile HF Harde ned Antennas ...t Malms'trom
..'"as conducted during February by Boeing and SA!,AF personnel.
The
antennas ",-ere already equipp"ed in the IFs but "Were not in wrking
order.
The 'h"i.lk-thru inspection had an aYerage of 40 de:screpencies
per site. Boeing Company has not set any africal date for an
operational antenna to be demonstrated .
The
esti~ted date for
the operational antennas MOS set for early July 67 .
At that time,
maintenance ",~ll begin on correcting the discrepencies at the
59
.ites.
(u)
The following is the investigation of Echo Flight incident
and too results. (u)
On 16 !-2rch 1967 at 084S, all sites in Echo (E) Flight ,
l'oaL-:!strom AFB, shutdo-,m ",ii.th No- Go indication of Channe13 9 and
12 on Voice Reporting Signal Assemble (VRSA) .
All LFI s in E
Flight lost strategi c alert ne.arly sirrrllltaneO'.l3ly.
No other Wing
60•
I configura,tion l ost strategic alert at that tire .
C~idance « Control channel So dump data was collected from
E- 7 facility and E- B Facility and all 10 sites 'Were tJ-.en returned
to strategic alett ~~thout ~ny LF equip~nt replacement.
All 10
58.
T~~en from Yessages on file at Job Control, by A2C David B.
Gamble, Hing Historian, on 23 Apr 67 .
59.
Rpt, "Honthly Report
Hardened Antenna," by SATAF (DCA),
25 Feb 67, Ex L2.
60.
l15g, (5) DH 02752, SAC to )ul SI~, Subj : Loss of Strategic Al ert
Echo Flight, ;'ialmstror.l AFB, 17 Mar 67 J Ex 43 ..

Page 8

.. , .
"
JJ
sites were reported to have been subject to a normal controlled
61 (t
shutdown .
The only unusual h~ events noted were the failure of the
secondarY door actuator motor at LF, E- 2 and the intermittent op­
eration of the diesel generator at ~~J E-8.
62
QIP
Technial Analysis Division (TAD) personnel inspected LCC, E- l
,
for l oose cable connections and the Electric ~urge Arrester (ESA)
63
room for any faults and noted no unusual discrepancies.
(U)
"LCF, E- 1 experienced co~mercial power probl ems in the early
afternoon of 16 Har 67 ~hich resulted in a burn out of ~~e 10
64
Hp Envir"ental Control System (ECS) chiller compressor motor.
(U)
At approximately 1400 hrs on 16 Mar 67, the 341st SKw
·~s a~vised that SAC Headquarters had called in OO~~~ support for
65
a complete engineering analysis of this problem.
(~
OOAH.ll c.ecided to send a task group to Halstrom for study
of the incident at Echo Flight because the problem pertained
peculiarly to 'h'ing I. It ...·as also decided to make the studies
and tests there because OO.4...I{!t \oI'as not equiped .d.th Hing I equip­
!!lent.
The task group included personnel from OOAHA., Boeing COD"._
pany, Autonetics J and 15th l2 ; they were to arrive on 17 or 18
61.
Rpt, (S) "F'.eport of Engineering Investigation of Echo Flight
Incident, Malmstrom ,AFB, XO:lt . _ 16 V~r 67,11 by Engineering
Investig.a.tion Tea."':l,
2~ Har 67, p 1.
62 .
Ibid.
63. Ibid.
64. Ibid.
65.
Ibid .

Page 9

33
!:Sites w:re reported to have been subject to a normal contr olled
shutdown .
61 <t
The only unusual ~~ events noted were the failure of the
secondarr door actuator motor at IF, E- 2 and the intermittent op­
eration of the diesel generato~ at LF, E_8 .62~
Technial Analysis Divi sion (TAD) personnel inspected LeG, E-l
for loose cable connections and the Electric Surge Arrester (ESA)
63
room for any faults and noted no unusual discrepancies.
(U)
LCF, E- l experienced co~~ercial power probl ems in the earl y
afternoon of 16 Mar 67 . hieh reaul ted in a burn out of Ule 10
64
Hp Envirrne.ntal Control System (ECS) chiller co:npressor motor .
(U)
At api>roxir.-.ately 1100 hrs on 16 Har 67, the 341st SKW'
o..-as 39.vised that SAC Headquarters had called in OOAXA. support fOr
65
a complete engineering analysis of this problem.
(~
OOA}{o\ deci ded to send a task group to !-1:al stro:n for study
of the incideat at Echo Flight because the problem pertained
peculiarly to 'r!ing I .
It ....as also decided to make the studies
aod tesh there because OO.4.1{\ ....as not equiped 'With ,.,ring I equip­
!:lent.
The task group included personnel frOM OOA!1A, Boeing COm­
paoy, Autonetics J and 15th At ; they "ere to arrive on 17 or 18
61. Rpt, (5) "P.eport of Engineering Investigation of Echo Flight
Incident, Malmstrom Jo.f3, Jiont . - 16 Y.ar 67, 11 by Engineering
Investigation Team, 23 Har 61, p 1 .
62.
Ibid.
6).
Ibid .
64.
Ibid.
65.
Ibid.

Page 10

34
66f
~rch 67.
A preliminary analysis was ~de of the Fault Isolator Test
Tape (FITT) fro~ LF, D-? and E-8.
Targeting support ~s schedualed
for a ~C Channel So data dlliT.p at ~IS E-2 and E- 9 which, although
returned to alert, were still felt to possess useful data. The
investigation "as held in suspense until the a~r1val of the OOAMA
67(..
team on 18 March 67 • . l'
Echo Flight incident ~as approached in four ways 1n the
68
inve~tigation: t)
a .
Revie.... of events on or near"16 lmch 67 and of flight
configuration.
b.
Investigation, and .,..hcre possible elimination, of cir­
Cll!ilstances which may have" been responsible for the io­
cident.
c .
Im"estigation of means of causing the results 'Whi ch
Mere noted at the time of shutdown.
d.
Investigation of sL~lar events.
In revie~~n~ the events of the incident, the Lee cre~ was
questioned  by Wing Kaintenance Evaluation Team (DCi1ET), OOA¥.A, a."1d
69
Boeing Company personnel on 16 Y~rch 67.
~)
66 .
Hsg, (c) OONE" 01012, OOAi1A to SAC, Subj:- Wing I , E Flight
Incident, 3 :1a.r 67, Ex 44.
67 .
Rpt, (s) IIReport of Engineering Investigation of Echo Flight
Incident, Halmstrom AF3, !{ont. -
16 liar 67, 11 by Engineering
Investigation Te~~, 23 Y~r 67, p 1 .
68.  Ibid., p J .
69.  Ibid., p 6.

Page 11

,.
•
In ~creening the crew it ~~s determined that loss of st~a-
tegi c alert and fault indication occurred In an extremely short
period of time.
The exact time estimates could not be obtained
but the time interval was estimated to be between 10 to 40
70t)
seconds .
The standby light was not observed to illuminate for any of
the ten launch facilities .
None of the co~~nd and status line
monitor fault lights ·..ere illuminated.
There was no pattern or
sequence noted as to the illumination of fault aod loss of stra­
tegie alert.
No flickering or ripple was noted on any.of the
other status displays .
The emergency lights ~~re on (all other
lights orf) and these lights did not appear to dim.
71
~).
The initial tine of the incident, decided by the crew, could
be no more than two or three ndnutes earlier than the official
72,6.
log t~~ of caL5 hours (l~cal). ~
The crcw also stated; the IF, E-8 had a channel 26 which
indicated it ~~s operating on diesel at the time of fault .
The
h65L (SAC Communications « Control Syste~) and CO~HUnications
equipment -was r.ot processing traffic a.t tre time of the in­
73.
cident. 1P
~either of the crew members ;;ere using any electrical
equipment.
Such as electric razor•• •etc .
At the time of fault
70.  Rpt, (S) "Report of Engineering Investigation of Echo Flight
Incident, Malmstrom. AFB, Mont. - 16 Har 67,u by Engineering
Investigation Tea~, 23 Har 67, p 6 .
71.
Ibid.
72.  Ibid.
73.  Ibid., P 7.

Page 12

36
'..
_ JJ
the deputy co:r.:~a.nder was t;..lrned a;.'ay f r ollt t he consol e to br ief
the c o~~a nder who had just been awakened rro~ sl eep .
The com­
.
74I>
mander ...as the first to see the faul ts .
Channel 50 data ...as extracted from sites E- 7 and E- B
ilrtllediately after the shutdo"1l of the entire flight.
Analysis
of t~1s data detennined that both s1 tes ~..ere shutdo"" n as a re-
suit of external influence to the G&C, no No-Go 1 5
~..ere deltected'
by the G&C .
Althouth E- 8 had indications of a previous Hon1tor
check No- Go it was not the cause of shutdown at this time .
This
~as determined by inforwation contained in sector 54 which said
t.~at subsequent to the last No- Go the C&C had corr.pleted an
iter ati on routine which is performed approximatel y- 2 hours and
)0 minutes into a restart.
Had a G&C No-Go caused this shutdo_~J
the Discrete Input ItAIi (DIA) ...ord would have been pl aced in this
75
sector .
(U)
On Sunday, 19 i1arch 67 J a team was dispatched to sites E,,:,,2
and E-9 to d~~ channel 50 data.
These t~~ sites ~ere in strategic
alert at this time but were sel ected because the y had neve r ex­
perienced a restart since the last time that a li'.aintenance ta.pe
had been used .
Information froli!. the Uo- Go sectors of channel SO
indicated that these G&C1s had never entered a No- Go loop at any
time .
This hareens the C.E.se against· a Ho-Go causing a shutdo-.m
of the flight. If a No-Cio h~d shutdolm the flight , it ,..ould have
74.  Rpt, (5) IlReport of Engineering Investigation of Echo Flight
Incident, ~~almstroll\ J:..FB, !-Iont. -
16 11ar 61, II by Engineering
Investigation Team, 23 Har 67, p 7.
75.
Ibid . ,p 8.

Page 13

,
'
37
76
been recorded in channel ,0 data.
(u)
The only nor.-d.etec'table fault fro;n the G&C section .hieh
could have ,caused a No- Go ....ould have been 10s5 of confirm codes.
This type of fault 'Would not have produced a VRSA c,hannel 9 and
12, but only a channel 9 .
This'.infonnation elir.d.nated the No~o
77
theory as the cause of the incident.
(u)
As stated eariIer, all 10 launch facilities shutdown ~~th a
VRSA channel 9 an"d 12 (G&C No-Go and Logic Coupler No- Go) recordings .
Because of this consistency considerable invest1gat1o~ was ex­
pended in the Logic Coupler area .
In the channel 50 anal ysis it
was sho....n th2.t the guidance section did not experience a Ho- Go
and therefore, it was felt th~t the VRSA channel 9 report was
not valid . It is possible} however,' for the Logic Coupler to
78
)
generate both of these No-Go .indications.
{§!feU
The logic of the coupler ~~s studied by the investigating
team in en efiort to identify a method by which both VRSA 9
and 12 could be ~~tivated. The opinion of the team was that
external generate~ signals caused the generation of these two
channels and shutdoftn of the launch facilities .
The possibility
of this is very remote due to the £act that all 10 couplers
~ould have to fail in the flight ~thin a few seconds of each
other. 79 iI>!)~ (u)
76.  Rpt, (5) lI?eport of Engineering Investigation of Echo Flight
Incident} j·!almstrom AFB, Hont. - 16 Mar 67, 'by Engineering
Investigation 'rC3.r.l , 23 Kar 67} p 8.
77.  Ibid. , P 30.
"
..
,
"
'
\ -
,~,
78.
Ibid •. , p )0.
79 .
Ibid . , P )0.

Page 14

)0
-,-
The only possible means that could be identified by the
team involved a situation in which · a coupler .self te.5t command..
UL
occurred along "~~, a partial re.5et within the coupler.
This
could feasible cause a VRSA 9 and 12 indication.
This va.5 al.5o
qui te remote for all 10 couplers """QuId haye to have been part­
80
ially reset in the san".e manner.
~(U)
Further studies of this prOblem will be accomplished at the
cOntractors facility since a full engineering investigation is
not feasible at this l evel. (U)
In the resEarching: of other possibilities,· weather ....as
81
r~led out as a contributing factor in the i ncident.
(U)
A. check ·~th Co~~nication maintenance verified that there
was no unusual activity v.:I..th E"I'!C- l or EHo-2 at the time of the
82
incident.
(u)
Rumors of Unidentified Flying Objects (UFO) around the
area of Echo Flight during t he
tiw~ of fault were disproven .
A Ho!>ile Stri.1.ce Team., which had checked all November l-~ li ght IS
LFs on the morning of 16 V.arch 67, ,"ere questioned and stated
8)
that no unusual ~ctivity or sightings ·....ere obser-lcd.
(U)
The 80lst ?.adar Squa.dron, J1almstro::\ AFB, gave a negative re­
port on any rad.i.r o!"" a.tmospheric interfe!""cncc problems related
84
to Echo Flight.
(U)
80.  Rpt, (s) lI?eport of Engineering Investigation of Echo Flight
Incident, Xalrnstrom J..FB, Hont - 16 Mar 67, II by Engineering
Investigation Team, 23 Mar 67, p 30.
81.  Ibid. , P 28.
82.
Ibid . , p 25.
8). IhIa., p 27 .
84.  Ibid . , p 26.

Page 15

39
· ~..
.. .
Capt. BradshaW" in the COjil.:~nd post at the time of Echo
Flight incident, verified that there was no activity on the
85
Primary Alerting System (PAS) at Echo Flight.
(IJ)
During the investigation it was discovered that Boeing
modification teams were at sites B-1, K- l and G-1 on 16 March 67 ;
but this could not have affected anything in relationship to E
Flight because they arrived at the sites ~ter the incident
86
occurred.
(U)
As ~ntioned before, a po~er problem affected E- l at 1453
on 16 Harch 67 according to LCC log.
The Brine Chiller (CH-l)
shutdown due to polo-er fluctuation.
This ....as not considered
unusual for po",;er failures Or fluctuations often. caUSe CH shut­
downs .
Bet....een 1510 and 1600 hour.5; E-1 experienced another
power fluctuation .
The capsule ere'" heard the }!o"tor Generator
brushes chatter. At this time the site manager indicated that
one phase had low voltage, but LCF po....er was not appreciably
affected since capsule florescent lights were still on.
The
diesel generator ~tarted but c~~ld not be put on the line due
to broken lead.
Co~~ercial power was restored at 1921 hours
87
on 16 Y.arch 67.
(u)
"In revie.....ing the maintenance historf of the fling, it "'"8S
discovered a sL«ilar incident occurred at Alpha Flight in
85.
Rpt, (s) llReport of Engineerine- Investigation of Echo Flight
Incident, Malmstrom .~B, PJOnt -
16 }far 67,11 by Engineering
Investigation Team, 23 :·far 61 , p 26.
86.
Toid., P 23.
87 . ~ . , p 12.

Page 16

:..
December 1966.
On 19 December 66, A Fl ight had some of it' s
LFs shutdo~n (A-6, A_?, and A- IO) .
The simularity between the
t~o flights was:
The same Capsule crew, adverse fteather con­
dit1ons, and co~~ercial powe~ failure after the facilities
88 .
shutdown.
"
Since fteather condition and Capsule cr ew have been elimiated
as causes of the incident, investi gation of electrical failure
was  started . (U)
The power outage that affected E-l at ILS) on 16 March 67,
....
occurred 00 the 7 .2/12 . 5 kilo vol ts (XV) transmission line from
the Winifred Substation.
Fergus Electric Co . (Xr. D. Young,
le....i.stown) advised Hr. H. Jackson that .a transformer shorted one
89
phase of the three south of ""inUred.
·(U)
Sites Echo 1-6 and E- 9, E- IO, and B-1l are supplied by 7. 2
't\V line from. the "'rI'inifred 5ubstztion.
No sites in other flights
are  supplied pO....ler from Winifred .
Sites E-?, E-8, D-6, D- 7, M- 2,
1'1-3, and M- B are supplied pOwer by 7 . 2 KV lines from the Hilger
90
substation.
(U)
(SE DIAGRAJ'S)
The source of power cornes from the Rainbo~ generating plant
in Great Falls and is fed through the Rainbou switchboard. on
100 KV power lines to the Sta~ord ~ubstation .
The 100 KV lines
continue to Benchland where it feeds two SO XV lines.
One goes
88 .
Rpt, (s) l1Report of Engineering Investigation of Echo Flight
Incident, Maln.strom. AFB, YlOnt . - 16 liar 67,11 by Engineeriru
Investigation Tea.L1, 23 gar 67, p 9.
89. Ibid. ,p 12 .
90; Ibid., P 14.
"'\
I. .......
,..,..
.
,
,
.~ _.

Page 17

TRANS F-ortmg R
OBF-
E-JO
E • 08
D-ö6
B-02
E 03
-09
E.07
}-hL4ER
POWER
E.02
1-03
g -04
E-ac
0-06
HORte
Po S s TAT
7.2 K v
50

Page 18

PIO
IA I leje•r
50K v
N t hill

Page 19

Rain bevo
100 kV
50KV
A-II
A-IO
rch
Plant
7.2 kV
7.2 kV
7.2 xv
I-z
DI s-r ION
yce

Page 20

41
to the Glengarry substation at Lewistown and the other to the
Harlow-ton substation.
The Glengarry substation f~eds the Hilger
substation with 50 XV lines and Hilger feeds the Winifred sub~
91
station with SO]{V lines.
The sites are fed by 7 . 2 KV lines .
(U)
A 7.2 K"t/ transformer shorted in the line to site E-) at
1h50, 16 March 67 .
This transformer is located on a farm two
~les south of tbe Winifred substation. Automatic reclosure
switches at Winifred subst2.tion opened, and ....ere reclosed manually
after transformer replacement later in the day.
This caused ttr:
Brine Chiller problem at E-l .
The transformer ~~s in the West
phase. It ....as not determined ~hich phase this corresponds to
at the sites.
Sites E-J, E-5, E-6, E- 9, and E-IO transferred to
Standby POI,er.
Sites £-1 transfered 'to Direct Current )DC)
92
operation.
(U)
On 28 March 61 , the 3hlst SM'tl in c~njuction ...."ith the Montana
PO....er Company conducted a s;.i.tching test on the 50 m high voltage
line between tre Harlowton and Glengarry substations.
The test vas
performed at the request of OOAj~/OONE as a part or the initial
Echo Flight incident investigation perfor.ned at i-:.alm.stroill.
The
intent of the test ....as to verify correlation, if possible, bet~een
high voltage ' ~~~tc~ng and launch facility shutdu~n or other
93
launch facility faults. ~ (rJ)
91.  Rpt, (s) IIP.epOr,t Engineering Investgation of Echo Flight
Incident, Halmstrom AFB, Mont . - 16 Y&ar 67, II by Engineering
I nvestigation Teal!'!, 23 Har 61, p l..4.
92 .  Ibid., P 15.
. "\
(
'J 'J I
. , \
. ,
93.
J-C'.sg, (c) n:{l 02998 , SAC to OOAMA., Subj : Proooscd Po;..er Switch­
ing Test for Echo Flicht, 2L. Har 67, Ex LS:

Page 21

After performing the tests, it \(as decided that com.i':lerical
f"
" '-,
I' 'i .:­
power switching operations \(ere not the cause of 'the EFl ight
shutdown.
This was based on the follo~~ng reason~ .
Other flights
fed by the Hilger substation ~ere not affected .
Similar shut­
downs occurred in A Flight LFs ~hich were supplied by power not
only fro~ separated substations ~ but also, from separate feed
lines froin the generation station.
Shutdown in 1965 or 1966 of,
r.Ussile5 do not correlate to any po;;er line switching in the
94
Montana Po~er System.
(U)
Since the only co~~on item determined in this investigation
was the LCC .
The!.CG po\."er fault transmitted to tre 1.."'5 on tl'e
hardened cable ......as considered the onl y po-,,'er fault capable of
95
causing the Echo Flight incident.
(u)
The i:lvestigation teams at lialmstrom, "'ere unable to deter­
~ ne a logical cause for t~e inci dent.
Further investigation in
the area of shutdo·..m results will be conducted in an effort to
determine a possible cause of this incident.
These studies will
be conducted at the contractors facility and ~~ll be included in
96f>
the next history.
On 12 January 1967, a.t 0905 hours, a potential disaster
9u.
Rpt, (5) "Report of Engineering InvestigatiSn or Echo Flight
InCident, Xamstro."Tl AFB, V.ont. - 16 Har 67, II by Engineering
Investigation Tear.!, 23 11ar 67, p 17 ..
95.
~., p 17 .
96 .
Ibid., P J.

Page 22

situation oc~Jrred while the J4lst MIXS F~ - entry Vehicle Branch
tea~ was being evaluated by the J90lst SMES in performance of a
91
Dash 1 A maintenance on a ",r- 56-Hod 1 warhead.
(U)
Durl~g the operation a T-290A (in~trument to register gaseous
air contamination) gave an alarm.
The area was immediately
evacuated and t.~ose present ....ere sent to the Hospital, Decomtamina­
98
tion station, for ooser~ation of possible contamination.
(U)
A Explosive Ordinance Disposal (EOD) team entered the area
wearing protective clothing a~d equiped ~~th a T- 290A, plastic
bags, and cotton swabs. - The warhead was checked Yith s.~pe_
99
tests for radiation with all results shewing negative.
(U)
A check ·...as To'.ade on the T-290A which gave trn alam and
....as determined to be faulty.
The area was again checked by the
team for radiation Yith no results .
The alert 'Was t.l-en ended at
100
1150 hours on 12 January 67 .
(u)
97 .
Rpt, (U) IIDisaster Control Team Action Report,1I by Team. Chief
Explosive Ordinance Disposal, 12 Jan 67, Ex h6.
98.
Ibid.
99.
Ibid .
100. Ibid.

Page 23

,,'
' . /.:'
.'
"
, [SA
I!
,
..
I
, "
.. ',
- '
,,,,
'~'::~~;'f'' ~""'".
." ...
"
"
,""i''/'" ,
' I' '
DCA
26 Febro.lary.. 1967..
' .... ~~.
. . '- ..
"':'-..,~./~;"..':;,.)
.
,,":~,•.
. - .....' :.. ',' ';;1 "
~':. 1. " : .
. -'~ .. :...
;.!..•.~ .,..:..-::::- .. , ...... -.
: ',', ,
,:'
,",' .
•
Thb ex>r.thly re?Ort for F~bru~ry 1c _ !'!~;;).1tt;.e:.c! tilro'lgh. your headquar t"ers
f or P.~ So',: (mOll) in G.ccorda.,cQ ' \~~th P"l.'';;~h?~ 41. Chapte r" 7. $.\(:I-{ .t.t.:"_a.
Tne f" .' ll')·,·I!:I~S. p~r.:l8r~?;'5 ....!\erc a::,~!.icaiJ!c cO>:" ':.l!:f;)cd to subpa>:' :·3 ~·2.";'':
of par.;:~raph 41,
~1'.CH 65 - 3 .
", ,_ ~ • ~
.--~
: " .,;. '..
. :
'
-'-,-' .
':', :'~"" -
,
"
a . " ' ~o·.o"!l Pro~l~:'l' kC.:Il:::
All !cJOW:1, proble!:1 ,Qr~~s :I ~"""(' t-~(!n
tho~ouZhly Ucntificrl .15 a rCG·.I1t of t: ~c '.Jal!:-T."1n..: I ns!,c.ctions coccuc t ed
a t. lii:1g: I
f.ecili.ti~~ c!Jrins r.i;:=(C'o(I 1 Fcbruilry 19£.7
thro'j~!\ 24 Fci>rlJoYry
1967 .
A OCSSG!;;C r epvl"t 0 0\ each ·... dk- t iu:u iH1S beQn sen t to Hq SAC . PAl'
and 13 SAD.
'
b .
Fo·r'.l.o!l tC[i)"Jn~tr.:1tio;",. Scllo.!d,.'J~' :
No forecas t of fOI'!:ua l "
deoonstr.J.tions cor. ~c C:il!:C l!ntil the. c!iscre;>or:cf.cs 1dc:"I::ificd during
c urr.?;;;t I.,'.:11!-.:-thL'c
ii~~?ec::lonn ~re cortcctcc .
d.
Su:.'\::ary of Techu.l.cal Orders !
No c!l"'~$c ir;:>:'! tho~e p'rev i ously
r eported on the S,tlltl!!'; of Te.cl;"ico'll Orc<:r~ .a:!.~ S1.C CEHls .
L
S!~:"lific.J.n:: t".:Htl!:rs :
HFr.bl~-Thru I nsP'!c t ions ha....e bcC!;'t
conduc t ed on 56llth S:lS flieht!' ?
Q .:triC R.
Tcntative ·.:.J.l;~- thr'.J of
!lit,;hts S .1r:.C T KF/SSll £.e.cilitiQl: h::n:e hc~n ~c t for: ~riocl 5 -
10 Hat:c~
1')67 .
Copic!> of the!c ins;Jcct!.O:1S ',lill cc fOr"'\;.ll.'dcc. in ti;~ ·s ~;:.c r.!.1i1ne.r
0$ ~H0\3 I f2.cilit)' ir,spc:ctioi\:-; .
JOt(l U CAR?OLT~ .
Co l ~n::lt USAF
Cy to :
Cotl.'.,anfie r
I f-51'..!', t'C I
CO:,~S t DCO, rC}:Q , BCE.
~AFf.. eeGS, SATAf(ESC-2J).
lOS ~ LS .
~2SSS. 4}0S~'iS

Page 24

DIG? 67
(Di.p
• AND.
(F Ecr,o -
C.G F•03S.iF.fi.zE.• COND
ANAI.Y$IS
. 51
ALERT • FER •
ALERT
TIE OCCUR

Page 25

(2) Ko support tea.n:s v.'ere utilized.
(3) There are no recca,.endatj ons for inprovement of local or hither
headquarters procedures or directives.
RUS E. TSgt, USAF
Team Chie? Ordnance Disposal

Page 26

STRO?..tC1.Y
SUGGESTS BE. g.
NC,T g.
i TF FROFOSZD TESTS
3E1.1VSD THAT
•w 13.1. E•v:.
T iF- NC-•GO MODS'
.3Y RXPRESF.NTAÜIIF.SO
D?.VELöP A
FOR
Y.T TYF. SYSTEM? ALI.cvs
. ...e... AT LF
i.EVELø
REQUIRED TO TEST,
ANA?.YZE P.T
SEATTLE .4 APRi!. TO A TEX!' PROCEDURES' SUCH PLAN
wil.?.., PROCEDURES,
'FOR SAFETY. .TH3. FLAN WILi.
TEST'SÆO
CI.EARANCE .BZ WITH SAC AS.
• REQUiRF.i.u [email protected]?} .41' 5
ADD.ffi.c:iaL. .T.N
7F.VA
AFTER
IT.G t;
raovt:.fi-
t? i T YI RES? EGE -c:
S.7.X
.41
: s.T.äFIAfi TO
ADVISED
.t. PARA
ARE FOR A
ADV.!SF.D OF

Page 27

Jj·:i'\~.'i '.:..:t C()l,J.:l,1L ".i'E.Ah A(..l'IOr-! ld~H;;('1'
;·li\ln.strom /,:--13) !-.lmtcna
2..
Uate of uj 5.J :;'L-r:r:
l~ ';,:.:m:ary 1967
)~ .
Lor~'\tion of 1,);.:: a ::-tcr:.
)U~t j· )ES hmitions Btorage Area, buildjng 1$40,
EE- ll Ba~-.
5.
Ol'"j? 5u!:rr.ittj nj: r·:cport :
:U~t i- } ;:~ !!:xp1osjve tJrdr.,'lnce Disposal Section
7 .
;(eport ;I~ rello,'''; :
J:Jc!,1osive vn::J,lnCt: Lli: 'pC'I:Jal 'fa.');:: (;hjcf ­
H.O~:5 E. [;ersl::'""!.!1 , ·!"5i·;t ,
A!'~ 194)3161, J;CGIt; Explo::;!ve Ordnance J)~spo5al Section .
(1)
On 11 ,Jall~er:{ 196'", ... t u!':):-O-,::i,lIt1tel:" 0~JlO loca.l, the 3hlst ~··;!I·;.''>RV
};V'.llUIlt.:i,C>!. Tean: c'~I~::;h;t in~ of 'l'::iCt ::oy g . Aldridge, Af 19l~535)O -
'j'e~m Chjef,
:~Set "ill :i::m H. 5!KIF.r:-:<"1ker, A:: 1"353376'1 -
l'e.2ii1 f·!er.:bcr, and SSgt Frank A. r.e.rt.:l.n,
AI-' 287113138 -
Te<J..1. t!(:mber, ;,',1 5
b~ ::_:,;~ f:vu1t:J.tud by lhe 390lst whil~ perl"Ol"iiiing
,ia:~I~ lA. r;··:jnt\~nance on a '.156, !-:od 1 hi.lril ead IA~"i '1' .0 . lljr.;-56lA .
llurjnt; r ur.oval
01 tlC1508 , the T-290.i., ~;erjal i-!o . d"-2450-i39,
~·;;. . \'e an D. l.xi ible ~k:r1il, iIluicating
tl:e ;,re5ellce of 01. haz?rdous enviro.'::ent. ·
'nd:; ;::a':ntp.:!8n(:1:: ::;,!i i: ... :in? ~erfor,: I~d in L:.c 3i,15t .<'1":0 i-,li.oitions Stor!!~:e
J\reil, build.~r.g 1i;40, i:..I(-ll r-.a int(::v:nce HAy .
'!'ho RV r:;"" inten<,nce 'tea;" chief
'/3r,t Al(Jl"idi~e so~;;;:ie!.l the ~l.::.IToI :'.nd the entire ;'<l'ea ,,;a:;
~....?cuate.:i.
The
;~;,O,!). trf<.'Ji!
c:o:l ~ist':n~ ()f ·j~i f. t ~.cr:;il"'l.n, Al(; Jaci{je I._ .:.ih!"E;·,es,
,~ F~I.<;681G63
;,,"!:'J
·;~j g t l;ooel't. .:. , ;Jt.::.ele nFl119:~215 ()c;Q1st ::.OD) re-entered the :!rea ":ith
}': ,L~ protectj.ve clot-ilinc, a secol;ci '1'- 290A,
~er:i.!l rio . i'F- 21J2-K!;, ?la~'tic
b:.." r;~ ,'-:no ,:otton
:; ·:;~ b:J .
'l'he :';56, lio,J 1
~·;a r!leC!.:l ;, au t Jle EC1SC3 \:.305 r;,:-.rdtored
\1ittl nef,:J1..ivc r.:::t!:i..t:J .
~ \.!j!-ll! tC5tS \':ere
t~l h'll frum ti,e \-1;6, Lou :i '.'... rne:ad
und LC1508 IAi-t T ,(;, UA17- 1-100- 29, para ; -1.1, .it.d 1S Fep 65, (;he 10 Vet 66.
Thin :l.nl'orrr.;lt.ion ':.,15- given to the :';ing Cc:t"J:lClnd PO !~ t.
At, c',t::!)l'oAili:ilte1y 1105
local ';':jet ~;p.r:jr.:~r. J i,l!..: Loyle :1. Turner, AFl97241;{1 i~P:! C<:?·9t .
ico}::o(~rt J . !-!Ullt.:s­
;I><;n, FV;1l2241 (3~Olst EGD -
Ot<~e:-ver) r e- cJ~tet'ed t.!.e .~rca ;-;ith both
T- 2<;'Q,\ 1 ~ a nd th'O FAC- 1S' s :;EriaJ, i~o , 4612 :wd 5518 a:-:d !"t.:::cnj torF.:u the
:~ .~ a .
';'he '1'2,;-0.'1., :;;crjal1fo , 1:F- 2450-B9 Hhich had (;~~Il ',):)I":d hy the ":tV
1,,'1.:i.r.t!!::i,~nce toe?..i!: ',:oIJ1J not setun IA ~i 'r .v . Illl- J5- 15 ",noJ ;.:as dde~~r.cd to be
jnooel'~t:i'Je,
T:;:;;;t V:~rsm~n .::nd (';,11)t. .
Hunt~ina.'1 nO:1:to!·c..i the }~;': -11 1,;aintcnt!nce
1;:1:'(' .!"C':- alp/I;:
c,.n~....::ina.tj,on '~iith ~ eg<.~ tive r(lsult,(;.
'j;ie ::-'E:cc,nd 'i'-2')OA,
tied.::l jl:o Pr'-21;~;':S ;'!~. s ,3./';.'.in
u~C':d, a.nd. L!oga111 ". nt":C·:ltj\'t; jncjcation ""as
. rc';e:i.v.I:.rf,
':'in'! ::;~
i' c~ j ons ~':ere rp.::ortetj to the '.,jOt; C( ..... .; ~.."":."u PQs~. All
.";:,.,,;tcctivc clot.Lin!,; wa~ ch(·ckcd
~'r;r con1.~':inat:'.cn tilth nCCttt:'.ve rC!Jal~s,
'j'J:e s·.'.iue te::.t.
!.::..,, :"~le:s \ '10<; " '0::;
i~~ vell to ti1U lJio-rr,viuI".:,(!ntal
::;!1ejn~er Sc'ction
t.o be
rO!",·:a.rd~rj to :-:ri" .ilt- ::.....t ter:lC"1l ,\F'B fl:!' cc::::~le !. e C!v; ~l'J3.t::on &. mm'lY~is,
l:lformat ::on r cc~} "r. d :·r'.ll:: :!rjl~ht -!" "-ttr.l':;(m ~ n d:i..ca.t e ci tha t ti::.e5e
:;".i1?~ t!!~t!i
\':Ere .:1:;0 neit·-.,ti....e .
,
.
if'
,
, :
,.
~' f ·
l , .: . • _ . _ .. •
~... . ­

Page 28

I ~,
\
..
VZCZ CliIA278
F!TS ·Jfl!} RU(S;1flf~fjlS5 r,i:(=:2S1:; ... S3SS,~'~·?Gi1[l3(lf~"
. ZllY SSS~!V
:.:.
, " P 17225 EZ l'fAR 57
:/. ..:' ':; :'F11
SAC~ ..
i·.}'. TC:RulI§mSYOOMiA HILL A,g Ui.'l1li
. ~.,·~;:·~i~ ·n~o :Rl1i1BKN1\/15AF
.:.....;'; :~1 · UUwMB·Oe/3lJ1SNW HAl.~lsrRO!1_M.EL.~LQ;E
.•. :: '.: Riiil'fBAIVA·,'f.ifos·6EHnr-cu' SEHU;;: ' \'lASH
/<4 RU¥~A!lft/BSD NORTON .~FB CM.•1.i'
I. .':: .: BI'... f"~: . ..
.. .:. .~ s E e ~ R E j! D~ · c2752 f::F~R o7~
:.  ACIXON: OCM·i.~ (OONcr/OO:~E>~COL D::iVENFOP.:Oc n·iFO; 15AF
<OH4C)'t 341SNi>J
(J)CL:!l~ BOEH~3 1~?fHO (Dodfl DOlJ:'EY, iH fI~ UTEi'iAr4 .
ENG!NEERHiCH B§f:. (SS ;, BSlm)
.
• BJE~ -
·"'I~S --
.--. ,.. ',~-''''.,.n ."
- ....-
:-""...
,..... ....... ",..
t ....... c..-n"'''
~~o ,t$ ~lJ;:)
ur
~lJ'iHL~I:-'.\~ 1~.I.. ::'l~J.~ ;;.\.III.... . r'# ... .J"', \·,"',.oJ., .......·,
REF: NY
~CR1n~ ['lESS"GE j)H?3 0275 i, 1. 7 iJMl G':) [;(.\:1ii: Sl!3.;Ec'J(O
ALL "l EN IHSSILl:S IN EGHO FLIGHT A'!'
tl;)U·lSl'RQi·~ LOST STR;:r ALEnT
TEN SECONDS OF EACH
OlHER,~ THIS XNGUJE1JT
· OC~"'; uRRC:D (IT GS45L ON
C .
16 ~JtlRCH 670 AS OF 'flHS DATE~ ;{ss !'~:U::SiLES bWE BEEN R~TURNED TO STRAY
:i ,.
'. '
.'1
.
.
I  1· ,
I ,i ,
,,
' .
.•...
, ..,-.

Page 29

vzcz'CiÜ.Å'/G•::
—-2 67
TFF. C.O ....tt.„
l..'.ik 1.3
iit'iR 57
FCRS
CALIF
e:ex
COC e
s:
PATTERSON CCO;- asn.æss2
ESQRp
SUBJECT:. i, F. INCIDENT
A TASK GROUP CONEiED AT ot} 28
REVIEW .TE EP.SULTS OF TO
REFRESEüTATiVES FRO',
OOA'.$A• 15TH AF
IT' IS TE PCSITION T ETASK THAT DATA

Page 30

,...
:'
"
-_.-._._---.-­
~;-..:-- :
co ' : '.
i
~
:":
:; ,
.
•
,f .'
"
y :
"
I
·
"
· ·
...
•c.
i
·
I
HISSlLE rrr~1G
•
L__.
.,.- ....-......:·
I .---.....
A!'!D 30lst Co:.!BAT SUPPORi' GROUP
----
............
ftc:JrClassified ~itle)
1Itpr 7hru 30 Jun 1967
This d ' -. ent was prc!)ared by .~2C i"I_.
B. Gamble, Hing His­
torian '.lnder the
.
rvisi~n of t
I':ing Inforriiation Officer.
It
i~ prepared in co~plin
ACR 210-1, 29 ,Tune 196~, and is
clasrl.fied SEC~T under "':.
. ro',rision of AFR 205- 1 as <='r.1anc.ed .
The
clas::;ification is
ired for
' ~e protection of information that
'1
':"2ry car>ability ana
€:l'.1.tion al status of tho ~';ine (u)
r
...
I ·
APPROVED :
g~~;7
,~
..
:,.--r. d
....DAVID B.1fJ\h31E}h2CJm3.6.F
Historian
reveals the
;n ~
OnN 1-1 . C.".RIWLL,
i-ling Co!<.r.-.arxler
Ui " ',,.',
m~ ' .
~N
-06'
Col, USAF "I
t'
COPY (J) CF  FCUR COPIES

Page 31

:ill:URITY STATEJ.~lT PAGE
Thi~ 'IIQ!Uiiie is 1II•••••••,to conform to the
in the source doc~nts .
It
be
ce ·"i.th the provisions of AFR 205- 1
amended .
'.
Tnis volume co
'~ins information effecting the .ational
'.
defense of the United
Laws (Title 18, U.S.C. , s
, the transmisaion
or revel ation of which in
unauthorized perscn is
prohibited by law.
This volUlile has
the hi~est do"ngrading group
the infor~ation in the
source documents .
, and consolidatio~ of
inforr3tion from ~~ny
downgrade provisions
Therefore,
individual
indicated,
all portions of this vollli~e
grOl!p.

Page 32

tHO different types haYe been introduced into the Squadron .
The
only ro'.ajor difference bet\o:een the vehicles is the· weight ~ Tnis
causes a prob!en in the operational data on the targeting t.pes
fed into the G&Cs ~
Ti1e present tapes have :lperational data. for a
liehter \Oleighi~g G&C vehicle, therefore, they can not compensate
for the additionf;.l ,.;eieht of too heaver e&.C vehicle in navigation.
This means that the tapes new in use would not be able to corre~t­
l:{ guic.e t.he r.rl..ssile equipped ....:ith a heavy G&.C vehicle .
Theorect­
ically, a .ni.!:sile equipped Hith a heaver G&C and ,,'ith the wrong
type of c-:lnputer tape l;'ould f.:1.1l s;,ort of its I target and there­
fore, be useless .
SAC has started a schedlJ1e to replace the tapes
o! the heavy G!.:Cs 'tti t·h a corrected t.ape (:·!Qr?-607) \,'hic!l Hould
COr.lpensate for the Hcieht difference .
'lhe SAC schedu2e for re­
placement is as follo~IS: Papa fliRht, 18 Jul 67, Quebec flight,
21 J'J.ly 67j ;h::eo flizht, 25 July 67} and Taneo flight, 31 July
41,42
C.,)
61 .
~ v
As $tated in the last. hi~.tory, :;t'.ltiies of the Echo flieht
i::cic.ent t·:ere t:l be concl!cu:c at the contractors plant. (u)
28 j·srcn 67, to:1 r C'Iic; the :,,·c~I.:,ltG o.r
l~hc investif;2.tion to date .
L1. Interne,·;, P.2C David B. Gamble, Hine Histol"ian, \-lith Lt.
c
Thomas R. Filiatreau, \';ing ;·faintenance Technical Analysis
Division, 11 Ju1 67 .
42 .
Hsg, (c) Dn~ 07160, SAC to Uorton AFB, 6 Jul 67, Ex blJ.

Page 33

Representath'es from the Boeing Company, Autonetics, OOAMA, and
15th AF attencied . 43 ~(U)
The group decided that insu'fficient data on the incident
existed to resolve the problem. or for adequate engineering an~i.ly­
~is without 2.cditional testing .
The present data suggested that
the problem Kc.S a "'jin&; I peculiar problen.
Since the OOAH.!\.
E>..-permintal Test Facility (E'Ir') 'h"a.s not a Hing' I type, it was
necessary for the expermnts to be conducted at l-iall:istrom.
Furt..l't­
er analysis of the proble;:!. sho...·ed that e;':permints \wuld be of
no real value until a i\'o-Go Hode cculd be reprod~ced atleas.t
44
at a 1F level .
~)
It was decided by the group to first cevelop a lo'ay to re­
produce a Nc":o Eade at the LY level then at the Launch Control
Facility (Len level before a test could be made at HallI'.strom.
The group was to rec:;mYene at Boeines' Seattle plant on 4 April
67 for develop!!lent of a -"2..y to safely reproduce a No-Go effect.
Thu plan ,.;il.~ to 00 developed at the N~tr:ork. Resolution Area (l'iRA.)
a.t Boeing, ldth a co~letion date for the plan set at 5 Hay 67 . 45 (§ (u)
During testing at Boeine, a )0 ~cro sec Pulse (-10 to'O
volt square ~·: e.ve) l-:as placed on the Self Test Com-nand (STC) line
at the c- 5JP Coupler LClgic Dr2.i·:er interface (STC) .
Seven out of
43 .
HSi, (c) OOHZ 01012,
30 Nay 67, Ex 45.
OJA1'-4. to ShC, "Hing I, E Flight Incident, 11.
44 .
Ibid.
1,5.
Ibid.

Page 34

10 separ~te applications of a sin~le Pulse, ..auld cause the system
06
to shut dOrm '\>Jith a Channel '1 .~ 12 1\'0- 00 6
~(U)
Subsequent testing at Autonetics has resulted in the follow­
ing explanation of what proo,~lf happens in the Coupler Logic
Dra~er .
The Pulse inserted is lor.g enough to initiate t~ Coupler
Self test sequence r:ithin the C-S3P.
HOt,ever, it is not :>f long
enough dUl'ation t~ enable control lines to the cOI'i'.puter to place
the computer in a L:oupler test loop }lode .
1'his causes the
Coupler to issue a sequence e4ror due to lack of coincide~ce
bet;.;een G!:.C and Co~plE'r i'~des .
This sequence error, toeether
with the action of tl';O other flip flop outputs (H- 17 (oi. 11- 20); is
47
sufficient to initiah the CO'J.pler and G&'C No-Go shut do·,m .
~(())
The effort at B':Jeing !·2,it ;;as to determine the source and
most likely path of noi!;;e Pulse to the LoBic Coupler .
The results
fo the Electro j·;a.gnetic Pulse (:!;~1P) testin& at the IF and Hing r"
indicated that t:-.e Sensitive Iniormation riet;.:ork (SIN) "r:e:re sus­
. 1:8
cept1ble to noi~e of the type that could ilave caused the !>l"':Jblern.
~(U)
The SIN lir:.es &0 only fron t..~ ICC to all of the IF! s in
the flight, 'I...hie:" could ex?12in the flight perculiar aspect of
491
the problem.
(,)
46 .  11sg, (s) oo:\z 01204, oo,u1.4. to SAC, uI·.:a1r.:stror:l E Flight Problem
HeeklY Status,!! 17 J..pr 67, Ex h6 6
47 .  Ibid .
48.  Ibid.
49.  Ibid .

Page 35

The best possible s~urce of the noise Pulse, so far in the
analysis, HuS the transformer f~lure ,,-hich occurred at a stock
....'.ltering throuE;h the 3cho fli~ht area .
The !'horting to ground of
the single phase transforrr_er r.:ay have unbalanced the three phase
Ilylt connected system enough to cause ground currents to flo'",
back to the genera.tor.
The Eardene.d Intersite Cable (l-iIC) shields
,.'O"u.ld provide a path for the gfound current thus inducing volt­
50
age Pulses on the SIN lines to all LF1s.
~ (u)
Testing at i::t~ has proven that there is sianificant coupling
bet"een the shields ~f the SIN lines and the Self Test Co:nmaoo
51
(STC) line into the C- 53P 1~8ic Coupler. Ie< lU)
A conference was held at Boein~ on 18 April 61 for the task
te~:'!1 to revieH the preliminary test plan for LF, E- 18, a.t Ealm.stroGl.
All')o, a test pl;:_n "~;l:; revie:.-:ed to accomplish the t.ransformer f2oi1­
ure simulation tests at Halnstro!i!..
Boeing had co-ordinated 'I-lith
52
the pOl-;er co:npan:,-, and receiYed t.heir approval for the tests .
~(U)
It was the consenus of the task group t.hat the transformer
tests should be r,;.n as SO::ln 0.5 possible so t hat the data ;..ould be
-available for the E-18 test plan develo!'.:.:ent .
The plan l-:as to
instrumently con~ect the nIC lines and po~er line into both one
50.
Hsg , (5) OC;~:E 0120u, OO_~J'J:. to SJ!.C, nValmstrom E Flir,.ht
Problem i-ieekly Status,1I 17 Apr 67, Ex L6 .
51 .
Ibid.
52 .
Ibid.

Page 36

~ ., ,
.... -,
S3iI)
r -­
E flight LF a nd LCC .
1
The pO"r:er tests were accoi.lplished at 1-1al:"!1strom' AFB ~uring
the Keek of 15 Hay 67.
The tests "..ere i n accordance with Test
Plan  DZ- 1S4!,6-1.
:10 sites Kere shut do.n for the test. 5\1
Instrumentation on the Sen$itive Inforu.ation Networ~ lines
and on the comr..ercial prir..alY power lines sho..;ed no significant
noise propagatio~ as a result of si~~lating the transforu~r [ai1- .
SS
/.)
,
UTe.
~lU
As ' part of the tests, one o:f the primary po-..::cr lines at
the Lee Has ,opened and then shorted to netural. 'i'he te~t plan
called for three operati~ns of this sequence; however,
~~e back­
up Enviromintal Control System (ECS) Failed to sequence properly
and rather than jeopardize the equipment, only one sequence Has
performed .
S6 m(u)
During the transformer tests, a one volt pe~k to peak 60
cycle signal appea.red on the SIi~ receiving lina at E-) .
Also,
02. high current spike ·....01s seen on the prir..ary po>{er neutral line
to launch facility gr~und point .
The 60 cycle signal on the SIN
line 1:as insignificant because iests have indicated that frequen­
cies in the area of 100 Kilo Cycle (!{C) propagated most readily
S3.  ifsE, (S) OOt2: 01204, OO..1..l 'iA to SAC, U!-ialnstro:n E Flight
Problem l:!eeldy status, II 17 Apr 67, Ex h6.
54.  Hsg, (5) 00:8 01787, o-JA.i'l). to :BSD t:orton AFB, 1I;t.almstro:n E
.Flight ?roole:m Interim Report," 2 Jun 67, Ex h7 .
55.·  Ibid.
56.  rJid .

Page 37

"i.thin the LF ,
Also, kno-;'::l l:as that the C-53P Logic Coupler
ft~ll cause Channel 9 & 12 Mo-GO .shut
rlc~n with Pulse width in
" 1 ­
- ,)"1
the area of 10 to 100 micro sec (a 60 Cycle Per Second signal
".as a pulse Hicith of a.ppro:O.!T.ately 16 . 7 milli sec).
The current
spike on the net:.tra.l po·,.;er line did not appear to extend to the
Logic Coupler i~terface therefore, it was not felt to be sign­
J1:ant.57 WA CI))
Each tLm~ a p~~er · Pulse ~as ini tiated , by shorting the trans­
,'­
[ormer or opening one phase at the LCC, E- l and E-3 were observed
to S'ro"itch to er.:ercency p~..:er momentari ly.
The capsule area <4d
not report any change in status from the 10 LF l s in Echo Flight
58
as a result of pQ""",'er tests . ~ CO)
The te sts r;.!n at Eoei n.g in t:e
~"R.I\. have proved that the C-
53P Logic Coupler Has the receiver to the noise Pulse irregular­
ly.
The noru~l signal on the STC in the C- 53P is (-10 to 0 vol t
~.llse of durati:m between t\.:o and 200 mcrc ~ec) "\-las applied at
this pOint .
In­,en t~c Pulse Hidth r:as set at )0 I.ticro sec, 12
Cha.nnel 9 !~ 12 i".'o- CO' :3 , one Ghannel 9 flo-Go, and four Coupler
Sel f Tests (CS·1') , ',:ere eX"1=erienced out of 20 separate applications
59
I
of the Pulse , ktfi! lU)
In other ".iOrds, 60 percent of the time ti1e responses ;.;ere
the sar;:.e as e;.:perienccd at Echo Flieht .and a5 percent of the
57.
1-1.sg, (5) 00:"IZ 01767, O)AHA to BSD /"Jort::ln Ji.i"B, "l·ial;.LStro:1. E
Flight Fr':'-ule:n Interin Report," 2 Jun 67, Ex L.7 .
58,
Ibid .
59.
Ibid.

Page 38

tir.J.e the resp'Jnse ~:>uld have placed the systen in a non Ei·.'O
60
.­
I' ,." )
status .
(')
, .--­
A 30 u~cro sec Pulse is e~iyalent to a frequency of 3 KC D
<lnd previous testtns at the LF and HRA ha'!e indicated the -Pulse
coupling Hit!ri:l the I.E' i,::; present at freC!Uencies in this general
area .
OO;{E has c?nductec tests at the ;till E~crirnenta.l Launch
.:..,..
Facility on 1.--- lIing I!- ;,r L~gi c Coupler to detera-ine if it could
be a receive. to this s;.;:-:e type rulse .
T~is testing Hill in­
dicate if tr.e 1'Tine; II-'l) Logic Cou!)ler l;i11 respond to a randon.
Pulse similar to the resoonse observed on the C- 53P Logic C,oupler
.
61
()
during test a~ tre Doeins: hi!....'!. .. /I); lJ
The results of these tests rrill he included in the next
history. (U)
Due to t::e f~ct th?t the ?cl-:er tests -~!ere essenti<!lly
negative, i t E.?fCal'S that tne cause of tr.(' Echo Flight problem
'rinS of the ~;{? or elP.ctrostatic nat;'lre ..62~{LJ)
A Cj~;H'l:-.e l 9 &: 12 l~o -Go shut down has never becrl rcported
at i-lines II t :o:!-J. '1 .
? his ic.ct is prob.:!.hlI duc to tre si~nificant
difference cetneen the ;-.'ing I a.'1d the 'ding II thru. V~ Logic
Couplers as 1-:ell as dii~ere~ccs in t1-e inter site cable and 1..'1<'
60 .
HSE , (5) rolE 01767, OOAHA. to I3SD Norton A...~B, lIj.t,a1.r,;stroin E
Flight :Frobler.l Interi."1 Report, \I 2 J'J.n 67, Ex 47 .
61.
Ibid.
62 .
Ibid.

Page 39

I
cabling: .
Therefore , Echo Flibht proble~ still appears to be
2. HinS I peculiar proble8.
63(t.
OONZ reco~ '~ended 3allistic Systell Division (BSD) acco:uplish
additional testing of the E~l? and electrostatic nature at a Hing
facility at !.:'e ti"e of lorce. ;"ioderization to deternine the
extent of vulnerability.
After tre testinr; has i solated all
~"'"
'problems id.th the Hine I Force tiodcrizati:>n configuration, BSD
64
could evaluate the need for testi ng of '·,'il".e II-V Force Hod sil os .
('
Air Force S;{stF.:ms ConT.and (APSe) has the primary responsibil­
ity for EHP testir.g, and has an active test progr 2.lil at the ~resent
time .
Therefore, OJAHt recoi:l:-,ended that 3SD and Air Force
;·.'eapons La":Joratory (}.1'"".11) acco:=!plish the:;e tests at Halmstrom at
65,1
the earlie-st possible date . t)
The results of these te~ts ;.;ill appear in the next history. (U)
In a pre';ious history a proble Cl of ;':o'le;:o,ent Security Alar:n
Syster.\ on the :":inr.;3' re-entry vehicles ('t.... C Vans 'h-a s described .
The proole':I ~·l" G th~ al~riJ sy~te!':1 unQcr the vans, was inoperative
during : .."inter ...:~athcr conditi'Jl1s, due to the collection of mild ,
sno'H, and i ce ur.de r the '/co.n .
Because of the Great deal of !!'.aint­
cnancc required to kE'.ep the illar~<l operational; the ;'!ing 5ugeested
63 .
Hsrr, (5) COl,;!:: 017~7, OJ,fl.,j·1A tl) 3.'3D
r~o rton ,U13, lI:.:al mstro!!l E
Flieht Proble'll Intel"im Report,lI 2 Jun 67, Ex L7 ,
64.
Ibid .
65.
reid .

Page 40

:YJAZ
.67
AFB UTAH
9.5 CALIF
AFB
THE. BOEING CO SEATTLäA•iASH
AMERICAN AVAiT AU?ONS.TICS• :ij.v
tAFL(,' 0>1.10
NORTON ,AFB
15AF,'Dr.OC,
,DOÜ.NG+MINUTEMAN
WRIGhT : 33}. : -r - •
BSD/ BSS;
E FL IGE
AttTA%SK• GROUP: CONVEN/,D OOAt.':A eg
REVIE!UfE :F.E'SULTS; INVESTIGATION TO
:CSø 00".
AND

Page 41

•e.s.v;..
Ar.EQUATF.•
B. QF AVAILABLE
F..x•.CST AS
AT TFF. L?.
A TEST: 1,1?
OF s? iäü!.i. wy.i,;.
AF?tR
01 DEVELOP TEST. PROCEY)üRÉS.:
REVEED%FOR: SAFET'GI
DEF.
.i.GåT IVF.
TRAüSOFC.'iER
TVNIS<CTT.VITY.•
or FS? ING
TRIS
you ADV.iSSDÅOF.trc

Page 42

1672 i •5
23 p. Ph 67
• UTAH
AFB Cg.i.iF
i',SD/'B3S. SMW/DCt,;
.91
UONR.iSCN)
3SD
STATUS
{SELF
. • TJE.:
z;.F. TEST
LINES
•.tSSiE?A.
... .,a.G.2. - :ns? i.iXE1.Y
TO NOIS
-.1:•. .31M
i.F7S
•PY.F. .exs;.

Page 43

531k
(htc.) SHIZLÜS
PATH FOR
2 n:. GCUE: INDUCING VOi.TAE
LINES TO ALL. NRA •PROVEW::
iS&SiGNiFiCATr COUFi.i1ä
THE SÆELDS OF. SIN€
CT5.7,P I.oezc COUPLER;
$2/éÄäCONFERENCEiiSSC}EDUL.sn AT APRIL
HEViEw TE. TEST LF AT MALESTROT
dp.tso; .gcco:yn.1SH THE TRANSF.ORtriER,
.TA'ILURE AT .iALMST9.OMc COORDIfATEjÆ
COMPANY, AND FAS.TéEiR APPROVAL FOR THE
TEST PLAN Vii.L SUBMITTZD to
ASUESEQUENTLY$SÄC• AND SATAF Wild. BE
TE TASK CRC'UP THAT
•SOON AS POSSIBLE SO i EAT TIE DATA AREüAVÅiLP.B!A:;::.:,
E',g TEST 'PLAN IS A?
to! HIC• LINES AND L.T.E 30TH
•getFå-.*tD+ECC0

Page 44

.-.
J.
•
,
Cf>tl
---,
WIIIM,I.{ .l.1I0,lDtl,1LU
27 DeC~;nber 15661
IHC BO£lH6 COllrAHI
EHGIHEERIIiG CHfI(JGf PflOPOSIIL
. '.O.(~~D;~~nu. WASH, ,am
FACILITY
...., (OO(
526
2827
'. .
,
·
,
·
.
.'
,.
,
,
.. "
', ",... :
! .,'., .
..
. .
:.-, ~
f'-. •, .. ~ .,.
· '",
.. · . . .
, ....
..... ..
•·
F{;"",iiiii,ii";r,f"",;;,;;"iiilMiff.,n;i";;"",,'T,,,fi,;i,,ii,=========;;;;;;====;;;;;;==="';;;;_;;_~_=_-::'='-=:- '
__-:-:--=-{
'
'
H -'
.. ­
3 La\lIlch Fac1I!ty
"'
. ",
" M
-.
'-
I
t-+.",il".i;""'",,,T,;;;";;,;;;...,,.,7,i"«,,,,."'.....,.....,""<'"""------- - ----------- - -.-----.. -
.1
..
Launch Facti!ty Support Building
i
t-tr"iillii',o<,\5''''",iil''''--:....:....:....::...-----.::...--------------------·-__
!
H
.
5
DC . S~ply for Isolation Relays - VRSA ~nannels 26 Aud 27 (LF)
DU(l tPI!("oH 01 Ct~NG(
- ,
------1
Provide DC supply "for the isolation relays being installed in VRSA chn.~els
26 Bp'.d 27 per ECP 1141.. A typical DC supply circuit for thes!! relayr. 15
!
shown on Attachment A Sketch 1.
{(
<
ADDI~IOHAL DESCRlPl'IOit :
.
~
li
•.
6
In6t~ctloDs -ror retest of VRSA ChenDels 2
8lld 27 c:Hl tor PCl't;(,lJ'1t:!l un:l \l enj;r))'
syste~ safety v1ll be required .
. '
lUSTIHUlIO" ro~ OV.h~ .(
R{QUU 1[0 BY rROtU~ II;~ ACllvl~lY;-:r;;;'-;.~"u:,'::====j
F"wG Meet1D.s <;:()
•
The isolation relays are being installed in
'VRSA channels 26 sod 27 per ,ECP 1141 .
Toe
DAIl, 29 November ~6 I AftMW.'(11I D 'tACt 6 1
DC po',;:er required tor these relays is to be
·----1
supplied trom tbe RP1..E po...-er Systel:l. This .JrCIR
7  in1tia'tea the ~e 'qu1red RPIE o:;hsnoe.
,"
OCV[\fJflrO"lt ~[OUI';[""'[~IS
81l/A
. Yes
1lAT(
TBD
.1.1 iT 1)jJ, IIW ~Ol tllIM~ .
9
No alternate solutions ere considered ..!eo51~~e
, .
.'
.'
R[(QI,II,{I..tIi:O rllonuc' 1(." u rH.IIVI IT
10
iliA
.
,.
II/A
ItrOI,l..~'("[)I.IIOH ··lnll J:(I.~nfll
l2
Retrofit required to provide Viring Ch~.,ge8 "tor isolation relays to be installed
>"
~ep" ", .
5
II"OCJtlJPMI(CI(O
'~m:"£f~ ~"'b!lVl~"6~\YlP'''''""B, EfI.FB" MTAFB, WAF:8 I FE'n'AFB . - All
, Fl1gh
13
CJro 00'"
HETF, 'LYSB
,
II

Page 45

I
A_PFP.01{ED:
Historian
1 Jul T{f:J1~p D,
~ __ !!a ti~
A5signed to the
FIFTEENTH AI? FORC::;, STRATEG IC AIR COi1:1.·UiD
?errranently Stationed at
EALVSTRO~1 AIR FORCE BASE , ( PEAT
CJ
II}
G­
.'
. ~,
-
-'0
, -­
~ t
M -
I
Ii'
.., '"
U)
\
C
-
~
::'"
0-,
HISTORY
"'
~
~
"­
~
...
of
.....:\
~
. '
JUst STRATEOIC ,(ISSIIE WI?U
MID JUst CO:1BAT SUPPORT GROUP
HQ SAC DXIH 9Z(: S"/:;.:<.
\~Unc1Asftie~itlc) /
-. -.
'.

Page 46

,"
.,
\
,
"
"~1I144
J F"'''''~7.-.7.'''''~i~,i.:
-j'17.
to confori:\
the classification of the information in the s~~
docurr.ent s .
It
~ll be handled in accordance with the provijions
of AFR 205-1, as
.ended. (U)
/
'
,}CI"
Ti:lis volume
information affecting  the.0ational
.,..?
defense of the
meaning/~f the Esoionage
.;;' .
.
Laws(Title 18, U.S.C.,
79U·f, the trans:ussion or
,"
~; ~.
revelation of ~nich in
..anner to art-~nauthori7. ed person is
,i".,
prohibi'ted by law. (U)
,~
,J>
.~
Reproduction of .this doc
nt in whole or in part is pro­
/
h.ibited except '..lith the , pe~~:issi
the office of origin . (U)
,
#
This volua.e has been placed
Group 1, because
I
it contains Forr.erly.....iRestricted Data ,
The historian's
17
analysis and cO~~dation of informati ~from "~ny sources,
....hich indivi<i1J~'ly may have lo..'cr dOi :ngrJ.~ provisions, results
in a
material
Synthes~{"hieh ".a, ha'le ;ddcr impliea~s than the
on .'"hieh ilis based.
Therefore , paracraphs h'r been individually
elaSSifilsbuti~ave not been marked 'with inddl.dual do,;ngrade
instructio
,'"
aU-po"'+!o..:!.S _.Qf t..lris volume will be excluded
from automatic regrading . (U)

Page 47

,
but usually if the o&C is off power fGr any period of tiMe,
it will· not restart when pol>er is returned b.y a Ir'.aintenance
tear.!. 133#>.
The dash 9 and dash ~O oissile problem in the 564th S~5
had been alleviated this q~arter .
Since almost all the  dash 9
l34
and dash 20 ~ssiles were removed prior to this quarter.
(U)
I{ISSlIE ACClJJE:m-s/mCllEtITS
There ftere no missile accidents or incidents during this
quarter, but testing on the Echo Flight Incident was accomplished
during this tir.e interval .
Testing on Echo Flight, because of
itls relationship to this section will be included in this
section . (U)
HISSlLE n.'CID~ll1S-Lcho Flight 'resting
Testir,g on the problems associated idth Echo Flight are
still be conducted by higher headquarters and the contractors.
The results of all these tests are not kno....,o as ~,-et.
l\'ext ",1.11
be the pre~entation of test results that are kno~~ and their
aIfects. (U)
As stated in the la.st history, a Ko-Go Hode effect had to
be reproduced inorder to study the proble:n.
This was achieved
by the use of a 30 nicro sec Pulse (-10 to 0 volt square wave)
placed on Self Test Co,,~and (STC) line at the C- S3P Coupler
133.  Intervie-..·, AIC David B. Ga!r.ble, viing Historian, ...... it.~ Capt.
Daunc W. Hollis, DO eoc.e Vault, on 27 Oct 67 .
134..  History, 341st Slf;", Apr ... Jun 67, p 28 .

Page 48

UJ
"
Logic Dra~er i nterface STC.
This caused the system to shut
.
135)
down \."ith a Channel 9 &: 12 N~-G~ .
~llJ
B~eing studied the source and path of the noise Pulse to
the Logic Coupler and suspected that the Sensitive Infor~~tion
Network (SIN) lines ~~uld cause the noise Pulse .
Further studies
at lialmstroil J·:FiJ by Boeing proved this analy~is .....Tong. 136 m(U)
Test~ at Boeing I s J:et....ork ?..esolution Area (HRA) have prove.n
that the e-,3P' Logic Coupler is the receiver of the noise Pulse
irregularities.
These tests had 60 percent of the tire, the
·responses ....-ere the sane as experienced at, Echo Flight, 2nd 85
percent of the time !)lacing the system in a non E'WJ status .
137mea)
OJA}~ thought that the cause o! the incident was of t~~
Electro J·jagnetic Pulse (EI-P) noise or electrostatic r.ature • . 00A11A,
also thought that the problem. '"as a riing I peculiar problem;
because Channel 9 &. 12 No-Go shut dOr:ns have never been report­
ed at Hing II throJ. V.
'lhis fact was due t? ·the significant differ­
ence between the Logic Couplers, inter site cabling, and LF
138
()
cabling of the Hinuter..a.n I and Ninuter:>.a.n II systcQs.
~ ()
COt!E conducted tests at the Hill Experii:"lental. Test Facili.ty
(HETF) on the \·,'ing II-V Logic C?upler to deternir.e if it could

Page 49

ou
139,1
be a receiver t~ this sa.:::e ·type of noise Pulse .
'f)
Results of these tests ....·ere directly.determining C- SJD
logic Coupler (Hinuter..a..'l II system) to EHP type noise .
Tne
C- 53D Logic Coupler ....~s found to be susceptible to input noi se
140
injection which resulted in an non EHO system condition.
~ (())
\ -.
This test ~as made i n t~o phases; ho"ever the resul ts .of
Phase II is not yet available to this office ; (U)
Phase I consisted of a correlation of noise inputs on the
c-S,n Coupler interface to syste;n noise response .
Preliminary
conclusions of Phase I testing indicated that :1inuteman I I
system was v~lnerable to noise on tr~ C- S3D Logic Coupler input
interface lices .
Four input lines in the C-SJD Logic Coupl er
~ere found to be susceotible to inout noise injection which re­
.
141
'"
suIts in a ncn E'r,o status .
~L0./
Phase II test objectives ....ere to determine the percentage
of coupling from the input of the Electral 'Surge Arresstor (ESA)
142
panel to the interface of the Logic Coupler.
~(tJ~
The probability of a non E'hO accurance due to a El1P noise
pulse can not be defined until OJA~St I s Phase I and II test
139 ~ liistory, 3ulst 5:11'1, Apr - Jun 67, p 35 - 36.
140. Hsg, (S) ocmc 02525, COAHA t:=> SAC, llj·faL'1lstrora Echo night
Inci dent,ll 7 Aug 67, Ex JU .
lhl. ~ . , Ex 3u.
142 " Ibid., Ex 34 .

Page 50

.I
,
programs analysis has been finalized and correlated with
113
SAJ>1S0 ' s El'lP tests results in a joint confe::-ence.
,
On 27 ~ 28 July 1967, OOAMA conducted an engineering
inspecti-:>:1 at Hz.lr.lstr::>:n .!i.FB of the interconnecting box, ESA.
panel, and missile a~ay drawers at LCFs, Alpha 01 and Echo 01.
The inspection found approx1oately 200 ~ere checked.
There
l"ere  no set patteren of loose connections noted on SI:~ lines
or Go~~nd li~es .
The interc~nnecting box was inspected for
loose connections, arcing, burned areas, and tampering, with
none discovered .
Missiles away draners involved in the io­
cident were checked and found operation as desiened .
Thus
lLLt)
no mzjor problems were uncovered.
HISSlIE U:CTIENTS-Echo Flight Testing (E!{P)
The direct relationship of Ei1P testing and Echo Flight
Incident are interll".ixcd, t hese EHP tests ...'ill be included in
this  section. (U)
SA!£O hc.s been conducting EM? tests at Harren AFB, riyo . ,
but  the results are ufiknO"..m to this office.
The tests nade ,on
'.
Delta Flight '..:ere co;;.pleted on all test objectives .
SAHSO, with
the  co::tple t ion of t.'ese tests, began :=::'!P testing at the S64th
113. Msg, (s) OONC 02525, OOAl1~ to SAC}
1I 1:~lmstro;;t Echo Flight
Incicent,lI 7 'Xug 67, Ex 34.
14L.  ~ . , Ex 3L,
..
J..,' i.r ';
'.

Page 51

co
-\
,
145
5M3 i n October. I)
These El1P tests by SAHsa and Boeing are. to discover the
l'eak spots i n the different t;:'lles of H.inuteman confi gurations
along the EK? field .
'\-tnen i"e.i...l.:': or faulty areas are found , Eeps
146
are i nitiated to correct these discrepancies .
~
., '
,- .
~
,
~
\_
On. 28 September 1967, Sierra 39, 564th 5115, was depostured
j
and turned over to Boeing for El1? tests .
These test s ;rill be
conducted until about :ni.d-Jan~ary 1968.
The primary reason
for Boeing' s EM? testing is to determine ~~e effectiveness of
the lightnine; protection equipment of the Real Pr:>pcrty Insta.~led
Equipment (RPIE) at ,64th S~·S I S LFs .
V~ious voltages wi ll be
inserted i nto the site equipment frow a test tie-in to si~late
the effects of lightning strLl.::es on the outside cable COlT~"!l'..lnica­
147
,\
tions, ground el ect ronics system and associated IT equip::lent.
~(UJ
Later, on 22 ~tober, SAYaSO joined Boeing on these E!{P
tests a.t Sierra. 39. (u)
A primary ca.use al"_ys associated ~~th Echo Flight Incident
has been connected with some type of adverse po,,"cr affect.
'lests
have been conducted tioe and t i me again to determine this, but
have always le~d to a negative result .
Boeing 1s testing at
145. Hsg, (5) OO~ 02525, OOJ._11A. to SAC, n;'lalmstro:n Echo Flight
Incident,11 7 Aug 67, Ex 3L .
146. Intervie·,1, Ale David :tL Gamble, ~·.:ing Historian, "..ith Lt•. Col.
Elliott Cold'h'ater, Deputy Cor:vnanc.er for Engineering, SA11S0,
Det 29, on 7 Nov 67 .
1h7. Ibid .

Page 52

", ,
"
Sierra 39 is just another test to assure that the Hiog VI
148
configuration ~~ll not be affected by adverse electrical effects. (U)
A conference was held at h'nitema.n AFB, Kan ., to review test
data for a Force :-iod EH? rodification .
The members of the con­
ference agreed t~t the data indicated ~~e proposed ~odification
would be effective.
A decision ~as nade that .additional testing
would be required by Boeine to verify that specific frequencies
were safe in Force Mod systems .
These tests were co~pleted in
1"9'I)
August 1967 ,
Three majo~ changes have res~lted from EM? testing.
Boein~
has sub~tted EC?s, n~~bers 1221, 1141-1 and 1141~2 , for the
r,odification of EHP for Force Hod.
Another change ••as a Facility
Change Initiation Request (FCIR) Haintenance Change lett~r (J·X;L)
ISO
number 2827, not yet incorporated into the Force Kod systems.
(U)
Presented. :;~xt idll 'oe the changes to the EM? fa::, Force
!-bd.
Because of the co:nplicated engineerir>.g terminology, a
detailed explanation given by the Boeing Engineers ',dll not bl:!
presented of the changes to the EHP.
Cnanees will be presented
in brief explanation gi ven by the ECP. (U)
Bocine ZCP 1221 w~ll ~dify the interconnecting box by
adding a major sub- a55embll containins zener diodes ,
isolati~n
148,  Inter-vie·""
AlC David 3 . Ga:'lble, Hing Historian, with Lt. CoL
Elliott Coldwater,
Dec~tv Corr.tT.ander for Engin~ering , SA.f1S0,
Det 29, on 7 Nov 67 .
149.  Hsg, (s) OJN'C 02$25, OOAEA to SAC, lI;-·1almstro;t Echo Fligh.t
Incident, :1 7 Aug 67, Ex 3h .
ISO. Interne·", AlC David B. Gamble , \\ling Historian, '""ith Lt. Col.
Elliott Coldwaterl Deputy Co~~ander for Engineering, SM~OJ
Det 29, on 7 Nov 07.
.
'
i ' ~~: - '
, "
j

Page 53

.1
00
transformers, and CO~T.On wade suppressi on transforrrers for each
Sensitive COl<'w":1and t\etwortc (SeN)/ Sensitive In.formation Network
151
(SI N) circuit pai r .
(U)
Boeing Bep 11ul dash 1 ~odi fi es the cable assembly set
(launcher) by revi sing ",iring to provice protection to Voice
152
Reporting Signal Assemble (I{'"'ItSA) Channels 26 and 27 .
(u)
Boeing ECP 1141 dash 2 r.~de anothermodiI1cation to the 1n­
terconnecting box, by adding two isol~tion relays and reroutes
153
wiring to connect relays into VRSA monitorine circui ts.
(U)
The FeIR, HCL will provi de for alteration of sensing at
3.PJE and of monitor circu.its to re-establish correl.i.tion of
154
sensing and ~onitor reporting.
(U)
SUPPORT-5ecurity
Last quarter, the ~ing 's proposel for the removal of the
!1overnent Security Alarr.l Systen or Re- entry vehicles ~C vans
was 2greed '-"it!"! by OO.UlA engineers .
This proposel ....as sent t o
15S
Headquarters, SAC for cor.currence .
(U)
Headquarters, SAC i n a message to OCAj.LI\ concurred .d.th the
Hing' s proposel.
t the ;:.ovemcnt Security Syster.t on
151 .  Engineering Change Proposal, uECP Ho . 1221,11 S\!bmtted by
Boeing Company, Ex 35.
152 .  Engineerir.g Change Proposal, "EGP No . 1141- 1 ,11 submtted by
Boeing Co~pany , Ex 36 .
153 . Engineering Change Proposal, nEGP !lo. 1141- 2,11 subr.'.itted by
Boeing Company, Ex 36.
154 . Facilities Change Initiati<;>n Request, "FCIR,
i'~CL No. 2827, "
subr.d.t.ted by Boeing CO::'.pany, Ex 37.
155.  History, 341st 81-0'1, Apr - Jun 67 , p 37.
," , .... - .- I ,

Page 54

VZCZCNIA76i
PTTSt.•YIN
PfØ7i5ØtZ 67
AFB UTAH
i5AFlMARCH AFB CALIF
iSTiiAT"SL1iG AFB MONT
RWMBOÅ/STATAfr t:JALMSTRCi4 AFB
fir'. :
+FCR SAMSO. CSMQB/SMQ?VSUQI/SNOA/SMTG? i) ;
SATAF (SAFETY) ANI.
FL iGhT iNCDEF? REFERENCS ;SAC
l. 't t •DMüB JIT-Y 29675 SUBJECT e
'TESTS CONDUCTE!.} AT TF.sc FACILITY
itE CoSSD 'LOGIC CO;jFi-ER TO
TF.SCS AT i CONo;•
SiSTED OF A
INPU!S ON THE COUPLER
TO .SYSCEM NOISE. RESPONSE. CONQ.USIONS}Æ
1 TEST ING 11 V is IV
TE,• C+5SD CCUFLER
C-5SD •FOUND TO' BE SiJSCEE
RESULTED r.) Ewo sysrmy
O-$ANAÜYSIS HASY':NT •FINAL TO DATE. EXPECTED
PRASE• 11 AT iS SCHEDULED .Tö BEGIN; WI.TÆI_N
•y. •iiØ3DÄYS0%. T E'.PHAF TESTING oæzc;rzvE IS TO
%covjz ,ctF TE TO TIE •
i?COUEERJ
;ThE OF THIS TYE 3!
i : i.1A2S?
'CCRFELP.TZ •YESUI.TSI JOINt•
20 DONFEREF-S
CONFERENCEo: REFERENCE
DATA: FIX, DATA
PROPOSED *FIX EFFECZIVF.. DECISION was ADDITIOliA1.i.TEST11f*ég•?:
WOILDÉ• BE•..RE QUIRED :.BY BOEING
10
WERE: SAFE ..IN FORE MOD. THIS t'E5! .COMFL'E?EDI
AUG OOAi•iå. AT
INTERtOléNF.CTINGÄOX AND
E-ørc•N 27<28 ARP. as, INS}V.CTF.ON 'INDICATED
•AF?fiCK 5 ESA'
CECXEÖO$.NO.
",QF LCOSEGCONNEC! NOTED
.g INTERCONNECTIK,G FOR. I.OOE CONNECT
? Fr.GE J..

Page 55

iNCDEiE WERE'. 'FCUND
ERSONNEL.. ARE
FROVjDING
REQUIRED;
AT WARREN ;rzscs AT "D" FLIGhT,c.KAVE •
AID C3JECTiVE$ .3EEl•J
CONDUCTEQ ARE SCHEDULED TO BE
1957J. SQUADRON eø ?FSTS ARE SCEDLLED
CMATEL_Yßi5: ccT 1967 DEFENDING ON F.ND DATE OF TEST INGO'
WILL CONTINUE ADVISE YOU OF OOANASS
RESUi,TS FINDINGS GP74e

Page 56

-
--
--
', ' ..
,
-~.. -.
" '.'.
I;~"" ' ... '.1. ~,.,:. ;"~"f'-:;
rHr 8DW((j CO.YfJ,HY_
WG/IIWi
'.' ,.,1 rr:=.
"L
I 1J,Jr,
CHA NGE PRC .. ~c
!(t-i-:a: ; ' , rv "SU'k,n..""I
-
-.--- .­
1....~"5l 1 i.:01 nt"( !l.~I'."~f H~
I \~ ~, ;:;.. : ~
--I\-:-'l~'.'
1
, 1--"v I
I ',_
F19-uN: A 1":1"'-
.>; I, ·
81205
'
... :,
... ' :
I
(::":?.J. C:OIf~ lHe:; '.,·.'! ,,~...,~ h: t·;; l-:Y o
t\"~. ""'r'f
!
':;.:" : .:
2
~ ".' .
,- _.. J
-
(:.',, -,.,1 Ci "':i 1 .l."" :,~,:.'(~C. ·~ :..;;.
Interccr.r.~ct1r.g :=.)x
;;oSI""'(, "t;.
­
J
"l'''-C'' ~ ·'d· · tt··;w··...·; .: \'-!"'al""'rF"?
'
, •..
I~;;;I ~ :"T:":: "j~r'"
"-
r
• -.J
· '.
.
•
I
lf~u"'.
I S~e Lir.e c
I
____
,-­
~ _....!, ': .. ;:.; : I :O ' ~':-'
>
5
IITU Or (Ii... "",~
?oIe 2 ·\ 1\.:.1:; e
Sl.l?:pres.~:-
C<.~'·· : ;::'1VI \;, ( ".10.:,".
This EC P .... 1!.l ?,-:ov1.ce fo­
:"ee~ :. n S:::. -;: e:: b:=!.
Y1 x, D st.:..:c:r or ...·hlch ·_OS S. eccCJ;::i;ol ~ S~ec ~:cer
-
.... hich
c.e '/e!~pt!~ l.!r.:!c: .-' E!.23d ,
~ ..,..: .... ;. 1
....es
.•.
I
site U11rle:- Ce? ?ueS .
6 IThis eN" ~rt ',Jill incll:c."e
t:-. ~ :'":::> lln·... !;"le :.pcci f!c ("I~jc:c::!'/es:
...
, . -
:or.:-.c... lz.e :.-orrn :,' "
- ,
enO::
::-~ .:: 'J.T~ A Te·;h."1! ·:a: ReO;'.ll. :-e::el: '. s ·cased. ~ r.
Eeq:.:i:-c-=ents f:>r r. :C L:i t'c':'se Sl,.:!,~ress:>: .
H~=~".= -·---· --·--------'--------'-----j
AL:l.~""'Tlv( 1('I':1IC',)
•
9
Nor.~
io
11
It( (OIt'J.'lSl).I.,ll"'~ r~"f '(;""Of 1T
12 To upCa.te ~clivcre:d l"-.3!"c··~r~.
Coo~1r.J;ed on Page . 11
I;.,RUJ,(iW( LI!(!I'v' N
13
I
~~"i:"; 1(10 JI~t';).
~ ,u c:=:J'.
~-~-----------------------.--------~ .------.~
R
R
R

Page 57

--
,
, "'
,
'-'
,
..
' :'~"
. : ". ,', . ..:-:.;.
'''"' '-1 )I.e-
ANALYS I S REV I SION NOTI C[
1 Th..L ~;':.':·.;!' !:. C.:-mp~nv l ~t~ - ~38
OItIC.I H" i OJh
~ ."\....
":''P
,.0
, "
•
L , Proffitt
CC~T~"CTO~ ...;>P.:<OVAL.
. ()
I !:l;':!. HL AP"",O " AL
~I~
,.l
.
y~..t.
'r;; I
lWE~: ';::21
,
E': A. Mclic~ ':l'-
",;:D/ ,
VOLU"I!:: TlTlE'Opcra!ional G.ou.-:.d Equi?ment Mode rni7.I..'d ISECTI
IP"~E I
,
Wins I V 02 - 15800 -1
I
FORJot. ·O.... e.. 11 iL E: Intc rconn~c tir.g Boxes, r :g. .'\ 137/M
NO
!;';T "o.1
I
.: i371M
1, J
Rev. C dilled 8 - 9-67
~Uu'-\1T1 ... i.....,ATE;
'~r ~Ec.;r/l-;'I
!
'
Oc~ Z",
!~67
i
L\t-VM [-V
ACT.jO,"1 AND REASON
A pprova l oC thi II ARN will nO l result 'n • change (0 the rc\·ision code lette r .
ACTION
I. ·Revise (he accond sentence o( paragraph LF , to rcad:
" Requi r emen t s shall be m<t when L~e input i. • 0 (0 2200 volt puls e
with a rise time of f.om 1 (0 225 mie rO:lccOnds and (h. volt-time
j nteSn.l i. the in tep:. ral o( the pulse shape de~cribed in DZ - I8148 -4{S)
dOl l ed 2Z Al.lgus[, 1967. "
Z..
Revi:lc par~graph U,H to read:
,
..
,
. IIH. I ,To limit volti\ge puhe:l at :he olllPllt o( the I - Box 10 values de:Scriberl
,
..
in p,,":a~r~ph5 1. F . I and LF.2, • suppre!lsion assembly conu.ininl{ an
isolation t ype tr.lnsforTncr. x..: nc r ciades .and cornman mode r ej.:c : :,)~
co il will be c Qni,ccted in cad, Command. HVC . .nd 4'].;. L circuit. For
,
each SIN circuit .
::Iu?prcssion <Lssembly similar to the Ccmmand line
.
,
•
assembly will be provided t nat contains .n inductor w i red between "'e
prirn<Lry .nd secondary wir.dir.~ ce nte r ta.ps oC the isolation t ransfo croer
.
(or "'e Miss ile A ..\·~)· signa.l path. "
'1f.2. Del,:ra.dation ot (}?eralinnal meSSol~e reI iabi Ii ly On Ii nc.5 nOled resul tir.g
.frnTn !u n ctionin~ o{ the no.>ise Sllp?rcs.:;;un ajscrnbly ""jll be prevented by
II clcet~on o( com?oncnts to limit t~c a.dditior.a) C I reui! inductance to be
c ompatible with e x istir.g comrnunication specifica.tions . "
uri) • Int roduction of unacceptable nnise .nd 5 i J.! nal dejitrarlation on other
Ii I\~ II ill (h ... j.n" ... dur;nw fnn·:li"nin.,: o f (ho III1I 'I 'r"","lul'l S" """,'mh I y w ill ' he '
i, rnvo::nl.."l Uy .d.,.lb ll "i 1),0 J ''1.111 h.,"tlJ., .... oIIlJdy \... 11 1.: 11 " .....1 (n '" Illd. J .
i tll
1:1 hi t:: hili "e tied .. closely AS prac t icable (0 the ou ter ahi ldd o( the
inpu t c~ble . "
,
,
..
"
1
i
i,
"H"'. Components shall be selected (0 a.ccept the c:nergy .pecilied jn pa.ra.·
graph 1. F .. S ..witr.out degradation . "
..
"-
,
3,
R e vill e:: Ide?tili.cArion Spec. no tation, s heet J, (0 read;
,
,.. ..
,
"Se e:: I~entiri 'cation -?pee:' S~lD-l11 - 1 ­ l00 (Wings I-V)
,
,
5- 133-11 1 -1-14S (W ings L\.l-YM)
"
.. "
..
,
,
REASON
-
,
,
,
"
" ' .. ..
"
To add revision.!! :r::evicwed .t EC? 12Z1/ 1 14 1 In-Procesa Review ·da.ted i iJ/13/67 ;
(See ARN MA - 339.Cor ECP I 1" I re\'laiona).
... ..
"
,
.. '
D.L7~/NL;: ISht. 1
- I
i I
I,,
,
I
!
..
I
....
":
,
,,' ..
' '',

Page 58

.'.
-------~~--­
" - ~ ,', :::.
I.. :::·... r.v:
,
,
IV.'i:'':'''_! 33
,
.1221
....OLUME TILLE.
Oper.1.tional G;,,()unci EG.u~;lInc{".;
Unmoccrni:r:cd VAFB St::)':I~<!r."'h!n: 02-121 jii VoL II
FOKM.'-O.. ~.il;L.EI Figure A 13,1.1 Rev. D "-7-6Q
I""
Interconnec;:ing Boxes (Va.:"".sj
1 377. 1
ACT!OH "NO ;;:[ASON
~ Appro\·.,l DC this change. will rc.suh 1:1 :l. c:<'<l.l"'.S<! .0 ;:h~ Y:t;u:rc A re ...ision caCf:.
-.
ACTION
I.
Rl!vise (irti,t sentence LB. to rc!.1.d a.s follo..... s:
III. B.
A method at connec.ing 5igo."$ l;-u.smitte.d betwccn tho: Launcner
Support Building and the launchoe::- c.s,uipments Vl.1. the Cable Assembly Sec,
Launcher (Figure A 12.. 3. I)"
2.
Revise TcchniC.1.1 Rec,t.:i rcmcnt 1. D. to re:ad as !,:,llows:
"1. D.
A method o~ rru.ting tile site .:;niquc si:;nais 0: the Cable System
Prcss·urizcd . HHdeno!o, SC:x.: (rigIJrc. A 1 ~ 39 or Figui'"e A '1032Mj ;'0 th e .
.site common signals of :he Ca.))le Assembly Set, Launcher (Figure A 1248.1)
3.
Add Technical ReGuire:Tl,e:nt I. E. as loliows:
"I. E.
Means shal: be p.ovicic:d which ·sJ-.;lll m~e~ th~ rc:q,:iremo:.:nts listed
below .
Requirements shall oe :-:;c~ ·..:h.;':1 the lr.?Hl is :L a to 22GO volt pulse
with a ri5~ time of from 1 to ZZ5 ....i.croscco;-:d$ :lnci the volt·timc -i.n:e..;.al
i s the: integral oi the puise: sr,a?e: c<:sCriocd ir, DZ - IS14S-4(Sj ci':ll.~ci
22 A.:gust, 1967."
The fO.ll.owing HICS lines arc rde.red to:
Command
SIN
HVC (where applicable.)
. Requi reme:nts:
L
The Common mode (line to equipment c;'3$si5) voltace ~n\'clo?c on
a.ny line: (listed abo..·c) at tnc out?ut at Inc :r.te:reonn~cti.n8 30:<. sn311
b .. ve a peOl.k value: of 600 volts i f no s:',J.r? discharge: OCCUrS .. ;: the
input. If a sha'rp discharge occurs a.t the ir.put the: voitage OUtput
shall not ha.ve a. sha.rp discharge: which is greate:' tha.n SO volts
;"
aznplitude, nor 5h~1 the voltage output exceed the
V( t } =± lODe
volts
-. 1ft
cnve.lo?C" ~dined. hy:
.,
"­
r"
."
. .. y . ·d.
.'
f. =­
t · =
frequency (Hz)
time (se.c. >:
,
'r,;
i.
'.
'J
_ ';.
.. ' ..
. '
ISht.
.'.
of.
2
I .,

Page 59

,..----
.,
,
I
,---
- ---------_
-".:..••..
"'.
ANALYSIS REVISION l'!OTICE
fO"'.~IC":";iCAC-C,O'".c,-.--c.-c-----,.,7"",""C.'.T'T"AC.'-;oc."c,c,_____~:-~-c'c·c~:c·o";~:~.-;.-~~--.,C
-,-j~~C~C;Ca~'","'__'_'":"'~,:"'~'c·"!c;~g_
/":\  .
.
-.
J ". J ; Wik-=.d
lO.Z,;·o7
~ \".;'?iJ L?'s 02, ~3, 06 , Oiu.CC;
. ::..:.~  .. EF. 1'0.
,
"
1ZZ 1
VO Lvue iITU:. Opera.tional G:-ound E<;t:.ipment
Unmodcr;1.iz:ed V..\...FB SU??!cI]'lcnt D2 - 121JO, Voi. lr
FO"IoI.,'O"G. TlTL:I
.
'1)--
1 R
;'.c.,
!~;, -; :-'0,:
~ 19Ure......
(I.
c ....
D, ';-7 - 00
!
-
Interconn.:cting floxes (Va:-:o)usj
! 377, I
!
1 &. 2
3 . ·  Add Techni"c~ R~c;u~r\!ment 1. E, as follo ...... s: (CO:"lt'c::.)
Z,
The signal moce: (line to linc) ...·o.)i~~g:e e:n .... odo?(! 0:"1 any 1i:1e: pai::- (li st.! d
above) at the out?u t of ;h c jn!.e:;'"Co:-..'1t.!C ~ ii.;;:: 1:3ox sn.i111 h ...... O'!
01.
~o,!a.;c. v.;.iue
of.600 V rTU..X~rr..um. anc: sha.ll not exco,!~d the limits ddined hy :
V(t)  === 600 e-' 7 ft volts
L
3.
Degradation of o?eratior.:tl" mess::!.gc rcli.l.bi:i~r on the lines nott:c
. re:oulting from (ur.ctioning of the ·r. oi~~ 5u??re:ssion means s!"lOlll not
e:xceed allo·......b!e tole:ra..'1ces i:"\ existing cot"r...lTH.L,icOltion system
specific a.tion 5.
"
-S,
FUtlctioning of the notse scp?rcssion, means 0:'1 the lines listed above '
shall not int"r"ocil.!ce l.:nacceptabl.: noisc no. cegrade sign;,js 0:1. other
lines through tho! I-Box that d.o ;"'.0:: have noise su??cession r.u! ans.
5.
The means shall b.: c 3.?.lbl.: of acceplir.g ;:.t l.:ast
2S watt - s~cond of
enc.~gy 1n (ro;n 1 to 1000 microseconos without degradation.
"'..
Add R econune;l ncd Sol ution rIo C. OlS {oilows:
"G.
1,
To limit ..... oltage ?ulse.ll Oil the output of rt"le 1 -Bo:"(!o y .. lu<!"s
d.escribed in p Ol ra~ra.?rlS L E . ! n:;d r. E. 2, .a.
sl.;??rL"~SH):l assemb!'j containing
.an isola.tion typ~ t:-.;.ns{ormer.
z:~n~r c loci.:s ...;'10 comr.-.1")n rr.od.: r.:j .::c ti on
coil wi ll be corJ\ecleQ to e.2.Cn c o mmand ~nd HVC. ci:cu:t. For each SIN
circuit, a. supprc $sion .asso.!mbly simila.r to ::"le corr.rnand li;.... c ilss<!";T,bly will
be provided that contidils an inductor wir..:d bt:tween the primary a..~d
seconda.ry windbg cc=nter ta"O!5 of the ' i!501atioc tr.2.ns!ormcr for the Missile
Awa.Y sign.a..l pd.th ~ "
.
..
"C:· 2,
Degrac;\: ion of operation31 mcssag<! rcli~bility on lines noted
resulting from. fu...... ctioning of :he noue sUj)?reSS10n a5semb~y will be pre­
,;'
.. ' vented by s'clection of comj:Onen ts to limit the additional ci!'cuit inductiUlcc
to be compa.tible with existing communication specifications."
:
..-,
. ~ ..•
-' .
..:
-,.' ,
. "G. 3 ,
Introduction o! un.2.cceptabl<! noise a.nd signal degraci.2.tion on olho!r
lines in the I.-Box duri.ns {u :"l.ctioning·o( the suppressi.on ass.embly wilt.be p :-e­
vented by . de~ign 'of-the input bundle assembly which assures that its :;hicld.
a.re. ti cd. as' croseiy a. pra.ctica.t;>lc to the'. outer .r.i eld of the input cil.bic. <""!
,
' .
•
.' .
."G.  '4;" Components sh~l be .!Iclcctf!d to ..J.CCC?t the energy
J
:
p:uagraph I.E . 5 wt"thout degr4LdOltinn. "
".
.~ '. -.
,....  ." .~
REASO:--';
.....,
• .
_
..:
-.(
"
",'
.'
L."T~o~~'~d~dcET~c~v~i~,~!~o~n~'~T~e~v~i~e~~~c~d~,!t2E~C~Pc-~!Z~Z~!~/l~1~4~1~I~n~.~O~'~T~o~c~c~'~,-"R~e~,~',~'c~w~~d~~~,~~~d~'~1~O~/·lL3~1L2/6L.7_'
.'
..  ....,. '.
:.
~
.
',: .'
,
.....
' .
..
~
".~ ''",:.~~ '' J.: ;~,: .
,... . '.
2
o!
"
! ~..'
, _.... ". , ••• ,
,
"

Page 60

VOLU....E TIT L E.
Op
"
1
s~c, :
er.1.110;'l.a Grounc! Ecui~m..:nt
0 0 ,
Mooe.niz.ed VAFB Sur.·:llco:-:-.i.:nt Dl-16i i s-;
FO"Io(. ·O ....c;. TITLe.1 In
'B· _ .
A
J,v"
. ~ .. ,,: "C.I
.
terco;"l;'\..:ct\ng
axes,: I &Ul'"C'
j
,
.
13 7 7~tV . Rev. E dated 8-16·67
1377:·.{V
I
i., Z
AeTieN AN;) REASON
_.App r av .. l of this AR~ will result in:. cha.ng.: :0 the r\!\.·is:on code lcu.c:.-.
ACTION
,I
1.
Revise: the second sentence: of par01g.a.phl. F. to read :
f
",".
'·'''Re:q.ui re"ments shall be r.a:t when"the inpu"t is ~ 0 to 2200 volt ?u15e wHh
t ....
a rise time of irom, l to 22.5 mic:ro3cconds anc. the "'oit-time :r.teg:al is
the integra.l of the pulse sha?c descri.bed in Dl-18148-·i(S) ca,ed
ZZAugust.1967. 1I
2.
Revis e paragraph iI. H to read:
!tH. 1, .To limit voltage pulses a.t the output of "the I --Box to va.lues descTi~ed
in pa.ra.gra.phs L F . 1 and LF. Z. a suppression assembly containing: a.n
isolation type tr:iJ1siormer ,
~t.!t".~r diodes a."d corn. .on rr.occ: .ejcct:'on· coil
will be connect~d in each command , HYC , and ~94L c~:-cu:t. :or C:lc;!'t SiN'
circuit, ;l. s up?i'"ession ass~rnbiy simi!.ar to ! ;~e cornrnar.d iir.<: :usernbly
will be provided lil;:;.l c:ontai.:1s ;in inGl.l.ctor wirca bctweoen ,:"e ?rima r y .lnd
secondary winding center til?' oC th~ isoiilnor; tra:1sform.:r ior t;-;e :'.l.i..5silc
.Away signa.l ?;J,n. "
I I  H . Z, Degradation o! opcr ..do'"1ai m es sace reJi;;;oility on l:ncs no:.ed
resulting from functioning of tr.e nolSC: .:51l??rcs:,ac;"\ .UGcr.·':'1"f ""'';:1 :,e
I
pre"'ented by sdection o~ c\,lmp"nc:nts to ii;;~i! the adcli:io:-:;J~ c~:-cuit
I
inductance to be com?ati-oic ·...,itn existing corr.rnunicat:on spcciiicatio:':s. II
,
'
I
."H3 . · Introduction of unacceptable: noisc_and _.:5ignal degr;:!.c;;l.tion on 'othcr
lines in the I-Box duri.ng fc..,c:tioning of the su??ression assembly will be
!
prevented by co!sign of the input bundle asscmoly which assu.es that
its ahi.eld 8 a,e tied as closely as practicable to toe outer Ihield of .p·.e
I
input cable. I I
• ;t .
j' o­
~, \
"
"H.L Com~nent5 ahall bl! s~lccted to accept the energ)' spec:i!ic.d in
.:  .
-
" ,
"
,',
-;.
, "
"
~" ....
"
'-....,
'
Sht. · ' 1·
of
~
OOE/NC
.".. .
I
.::'..;. . 05 :lnc. 05
,' ,
parag::-aph 1. F . . ~ w.ithoul degradation. II
' .,
.., "
','
•
,
', '
"
.'
"
REASON
.
.- ~
::'To add revisions
'. '
reviewed
-~ .", .
,
0'
u ECP 1221'/11<1 In-Process
..\
- ~ ­ ...
'.' .
. :- ..•.•
,.

Page 61

..
10
B.  Prov1c C'
cc~s!l e:-.f;;1:::ee::-t:--..;
C. C 5~f7l, spec1.f!.·.:~tlor..s em! coc',,: ~ c:l:.at.l:):"1 :!O':
t::odlf:r1r..g ?1g-..:....--e A's 1317 a::c 13771·! -
In-:c:-:::):1:!ec't:'~ (I~ 3,,;-: .
':.'hi:;
I'
t:od.i.ricati:xl ·... ill consis~ :;,~ t::'!' edd1-:'!.o:1 of $ub-l!.sse:.H!=,s '_':'':1::':1 ;"::e
~lstlng: r-~x .
Doe s~-:lsse=~,l:r .... i11 ~n·.ai!'l =c:.er c..ixes ,
!.s::l:=-t1c~,
trt!:lstor:-:e!'"3 .!.~ CCC;::')1l ::J':'e :"e:e!.:t!:::: co!ls :0:- esc:: :::'-:::/S::;, :;.1:.:, e:-.t!
Status line CI?D..TI P;'I~'::: cY..l.: l~ e": !;l:l a s~~et. r..eal ~n:.c;':e,: e.r.d electr~c&':l:.· i
con..,ected .~:' c.u=s of e 5e;Jl :-a:'!! 'J1:-e . b':J.."';~::'(' .
~c: existi~ ·... ire l;u:,Cle
'"
in t1::e 1-Eo:< ·... ill also C~ r::.c.:!.!'t~·c..
~"-!':e;"l a
s!t~ l':as
,:;~ratio:"l.el
F.lIrc!cn'ed V.,!ce Cr,on-iel
(~'.,=:) ·circuit.s cO:"'J,c-:tec for use, a second. s·io­
I
a&sC'Clbl:,.' \!s!.:'.,6 2.e<ler C:~ ::.: ..::; I
i3:-:'e.t.:'O:: t~::::!ron..e= a:-.l~ C~C~.J;' li:oCe'
rejection colls v1l1 ~e: 8~='~C .
Note: :
This C~~:1E;C for F:.g\l--c A 1317 o.:;d 13 -;~ is es tollo_'s :
I,
I
~I"""-~ !
13-":"\.( ("1"-. r
IT
•
~....... -
r ,, .
..
, ~
-I
-r"'sr, .,..,,....
. ' ... ~
I ...
f or ~I;! .... , ::'n..
a~t;t "",..: ....
c,  Pro'I1ce spec!.!.'!' tools rcs,:.C.!"c<! fo:- :!6UIe A's 1377 a~rl 13Ti:'! ~:l t
R
in8t811e~b:1 e.::ci c;'cek·y..:t !!1 :tc fiele!.
D.
This :;:C? '.I~!.:!. :;!";)\·tde e :;!;.i;
~I '!.':;:;;~ ?ib""..l..!'e .t...
1:;'7~; Irlte~'::.:In::p.c':.!~
Eo:.c: Cor S;o? z::::.
Fabrir:et~ 7r~c '.!ctic:-: ~!'-:.:~::.-;~s n:-::d
~!"o':i ':e i'_:~s er.r;
e:"Jf.1::~c:-~no t'~r
ZIL e"d :;:..;..;/~:-? II! C\~: ·;.!.:.!:::::r..
,".r.'.~ :!.t.1·;1;31 :~'.;.5.!.!flce :'i q n -:'est.s are
n:lt  re ·;oc;:,c:,:-:~-:!.
(~
F.  !c.cnttf:r -.-e!.g::'t c?-.a::.oc b
t~c ?!.,;:.tn: ;" ' s 1;Ti' e~ ,! 131i!·! I:lt.erconncct!.:-.g
?
Box.
G.
Revise ACQ '::359 cr.\:! :"CO 3;C2 coc~e:'l:'Qtto:"J to' aL!o·.1 p:-..::slcal tlnd
electrical ;::;:;;:-:ec:.io;') ·... ith ~l:e ' revised '!l~..l.rc A's 13T/' a:-...c. 13Ti1-t
InteTco~~c~i~ Box.
H.  This EC? 12cl cr..o.ll5e sh~ll ~ incOTpOTOhd cO:"Jcurrently '.11th ~cp, II!;!.
R
' J .  Analy'" ?en.ion "ot'ce' for FlO'"e A', lJm~. 1}T1.1 and 13T/XV
R
tire 1Iu.b:litte.c beI"e'.lith for c. ppro\"1!I .
.
' , '

Page 62

....
;.~f_ec~~:;t /I.
~t:!"' E~:'':'P
:8.  If this cr..er..ge is not
1:-\(:o:-p .)rett:.'~ .
a;· e:--ct!~:-:.::l S~,e.t!.!.5 of : ;3 - 13;'o\-:·~
1.~ Jeapard~z.ed u..,cer eleet:-i,:t!.l C::ist:..o.r~:!n::~
'.!::·,·l.a:~.:";:c:::t.s .
c.  Progrtt:ll Priori'ty -
ExP'!~l!:.c-C
-
.",'
IDcor-~rat1on ~t \/1 no I ".,.
D.  Failure lata 1s no~ c?pl 1~~c:e,
Z.
End I!:.e:l Relie.bility:
7"nerc: are r:o C'J;"ltrect1.2:' ~-=::.clT~;:: e::~s !'~r ti":e : !!;lL:""C 1-, ' $ 13TI &' . 137~-i:
Q
R
rellabl11"ty e5ti.~t e ....~ .: :.. ":'!"
:;'.C?~.c ":' e:;
~.o:!r t o~ th'!":
! :; - r!"~::eH Re·,ic·.I ,
Tbis Eep c::>es n:lt r~ :..:1re CO:l:;:---!:c~or lr.s:"n;"l-!t~~n or "th~s r::-~!"'.;e ,
Natvlthst4r.cl:-.g t his filet, i'C is :-eecr.~·.en~ec t.::et Co~rect~r .ecco-.pl1sh
the ins~llatlo:l effort .
J(1t "llI.lidation fa';" .. :--;~ .... ~~-; ! \I~.sian e:'".~ .. ::~ .• ' !.r..:;s II t:-.:-a~:"l 'I r".odernl-:ed
R
vas1an to be ~cc:cpl!Gi:ec:: at 3!.'? IE .
.-;:-;:-:ry ~:~rH;'ce.tlo~ e.::ti i(1t Proofir.c;
R
t5 not recCI!"J:".e"c.ed .
Line 13 - TCTO RE::J.U!:,!.!.l:
(Cont 1:.uec :-rcr.: ~F:e 1)
Pr~p5re ?ar:\·· U..r.;:s a::c coc~:i.:..e.,," e ",,·.itt e:·r-::- c :;."~ ;\:r :!>rce O :- ~e;.:::eti!:'n ..
Prepare F.~co:-d :':;~c -;:1:te ': -r.?!{e;;:? !'!~:~ ;" ~':ci ') :-{~"' r il'). ~;':·:<"::':·~;C - ·:.t15
R
far  Figure A ' , 1377 e:::c. l~.;::": I.!.-:";'!"r ,;m;·_:"8ct. ) .. :"'{"~(,~;:!.) -6/~ i n e:.:corc!ar..ce
it
.... ith MIL- T-yS3!iA , ce.te(! ~l ::.,c~~ c..er i /...: .
All ite:-..s tbat are n:>t d:ecE..eC. (x) I!!re :'lot I!.~rec"ted .
Li.. ~ 17
~;c 2)'
"
, ,.:
-'
..

Page 63

"
Psge 12
,
In I!CCOrea!lc-e \lith th~ ~e'1"'~:-c:::,::~r.!5 of =-:!:. 62 - 5~ !-'~!.:l~C:'.3:"1::e: ~!".aly6f~ 1'0:-::':
'
"1'
,., - ,
.,
'--;-"\'
" - -,
. ' ..,----,..
R
• ,
C/C15 \lA...L
",e. Te '. sea .0:-; F;o.:.:-e" 5
.:..:.! . "'
.:..;;; ._l!.::G .l. .. : ll" ' .
,C"I.S?~
vill be tor ::l:-genl:atb::lll ~::<i fic::"~ level 2.::12
~;~?; l:' :::>!':: :/':1 ' $ .
'~ro' Inc.~!'I::u:.-e Tor.: C' s ·... !~l ::e re·.. !.~-:::!
'C~
Revlc·... in Ueu or CD~ .!!. nd ?~ ;:..
Tr.e revised l·~in:e".e;lc.e :'.r.!l:.'s1s !cr ::.!"".::e .:..
1:; 7~'~ ' ....!.!.!. ':~ :-ev1.e.... ed I!=~
Air Force S~cielt.y C~f.e3, ':"'!'e,.; ~-:>ces ii:'",::' 71:$:-
~ .,)f!'cle:-:cy £.,e'/el Codes ·... ill
be estab11s::ed 0:' rc\' i:.c'; '.:5 Te ::;,u..! ;-~c. ;-::-
:;:~ Fr.:-:; :'I:-_-:el :.c~ e~':'
::-e~,jI"..::<tl.
lnforcation section's.
Deve lop ::alr;hiC!.-"llit:: <::-1:'c.18 for ttl! re';1se<: Tic;u.re A' s
13rn~ , 1377.1
R
end 13TnN.
R
Prcpe:-e a oa inta 1~o111ty p:-escrlt~ tio:: tor
,~ .?r~cess J:-esig!'l .l\~le\J .
;
I
~pot tcoltr.~ is ~ot orre~~ec .
..'
[Joe 18 - r;a.r.l:l:CLA'r'E..E:
(Continued f;-~ ~e:ee 2)
1
i
L
L1De 18
Line: 19. -
Tf.Ar:l!:?,s-;
(Cc::Itinued fro.'? ?age 2)
R
For the T-ll Tn!!ner 6ee the att4ch~ Training £qui~~rrt Supplt=ent .
R
.,
•.•
'.
I

Page 64

"
,
T . O.·s Affectec:
Contract 'i!:D:
2L~ - Lr~3~-2 - 21
..-..~.
!i-;??A:;:r;Z" CA3l:::: : ;'~
-
.. .......1
..
21.H-LG-GCA-2 - 21 -1
:;,,:.:::.,::~ :.:"C!I.-.:I'Y ;.
:Lr:?:'3I:'S o.3L ::!: ~;tj .. V;,?3
21J.!- L£:?.GC3- 2 -21-2
!,.\'.-::::! :;.crL!?~: !, ~:..;~ ;.:':: C:-I:::~0:. ?:,':::i..r.(
2l!·! - !.G~303-2 - 21 - 1 .
r...:.:..:-:;.::-:
:." '~ !.i..:?!' £. ~.;r.; c-\ C,);.~(l~ :-':'CIT..:"!"'{
!':,7?:"Si":'l; CA!!!,:;;C · .. :."!::.j Ir
,
2L"l-!'G.·f)0:3- 2-21 - 3
~';_-.::::: ?';O:ILIT'( .:":
rJ\i.'~iC:: CX':I1'f.O:' F:,CI:ITY
.~
!,;,:;::'::i II",.;: rL~'! G.: L,\'.!:iC;: OH:'P.OL UC!:!':'J
Z;:o:';':';S! . !. CAE:'!:it:; .. ....::r. V
2L~-!G~3Q...... -4 - !
r,~:-0:':,;/3 ·...U?.J:: ~·:.:'"72·: !L:;:"-S!P.A'1t..D ?!.~S ~.::,.:_\::r0'.,"J
.,...,-;:... ·/':F " ';:
........ r
r ~~·,.. -r: ·~ ':>'::";"":." o:c-..-,.-;--: ...,
2ur-IF"';'QCA .h - l _l
.......... ~'-... -'I
.... . _ .
-
..... '" _ _ • • \ .... .1. . .... . ___ '''-'' '' '''
~._..:_J_.."
R
Lice: 20 .. DmP.FAG: :
rc\t'c'\ 0420 r~!:o:-cs 't,:,e i:1t e rie.ce effect 0 :1 EOei:1g ar.d. ?e~Cix equl:;x:.e::.t 8:'1d
F!
inter!e.ce Q..x:;,:,::e~ts.
R
, I
CO::J.dt: c!; 0: !.'1-;":')cess ;:.e,,':"e·J in lieu'o! ff2,
cr·~ or !nta rac~£c s'.ll).':llt~l
is rC'c~rr.: t. ::ccc .
·:'~~:-.nicai a;:;.::-ovnl. e!; tr.c Ir.-?rocess
r. ;:: "'i~.J s;-..ell. co:'(s:: i t:.J.te
8ppro'l~1 tor t::e co::t~ct::r to proce<:(! ;/1t.~ $\!cseq.... e::t
er~:::J :-t. .
First. Article Ccnf1;:;:·.:..-e:!::;:; Inspect!on {:,~C!j end Tca."J. t.cccptanc c .i~e"'ie·.J
(TI\R) ere !:):)t !"'ec~e::cec .
"
.... .
"
"
-
'.
-, .'

Page 65

t-
COMPANY
1
Zee Dash
CHANCE
81205
see Dash 50's
•e Noto
4
See. Dash
5
rc.vide i en _ .X•.'0Vp-
••g.st
rcct:—••.-. '.n•or.ch
1
1.
7 n tees r.oa.se tn
i
...v• ao.tt. •
n. feet
Cor.:.rt-.i
an ECF
Can tort 5
( C C r. oa 3)
s:-event
To
thc
20 2? not
7.m.Ä}
See
Sce No's
.tce
Not G
i:

Page 66

((",1';;,1.(1;:,, :
~ ".. .\.,
!ANALYSIS REVISIO ~J 1-:011CE
VM.~ - 33
rho! ooc; '.i= Com;~;lny
I -----­
s,,~,,-,rjJt 04:1 ·
O~I(;: ..... ,r,~. /; '.I..'" - • " :,/
!iI/I i ;IVIIY:
/.
/ ..,., ....
-:' . 7-06
. VAFfl-LF-05 & u--os
C. W I!'nl: \~ T
J
H:nlt ... r;·~r,~ ~i..
)01>,
r. :':.I:tA( 1(11I ... ·I ·>:(l"(~ . r., .~
'.
1.lcr~1I
: !-.,~ ... ...:.... ~ ....... ­
W • .'\, SJ,,;:.OI..
))11
1-:=:.--­
• HCI·
'leI.
....,,11,': 1 l' I1I'OGE S)'Slcr."l Spcciiication 5-1))·11 ~~.:l(krnil'.cci !
V • .;FB Supp . !)2:.luI19-i
150 ~
I ~ .'I\ I f'1W; lm t·
lin ""=
Fig . A 1377MV ,
~ c v. B d:..'cd &"- 3-65
I'>'
lnt c ceo nneet i ng Boxes
1377~1:V
1
",' 11(• .,. ,l./iO ilfJ~C)"
r-
Appmval of t his cnange will .cs uie in • change tu t he Figure A revjsion
h
code.
ACTION
.
I-
Add the !ollowi~g techn:.::d r":Cjuir.:n\.::nl to ?"\ri.g :-.L ?h i. B.
"V RSA monilor lilll!s io r
I!G\ :i:)I~'.:: nt ·in t :\c L:'unC(;CT SU.?PO r t
Building TCGI:i rc: "
me;'ns to . ?TC'lt..:,,·t cc;ui?mc;,. d~1m.ls:e to
thc PTog:-~t;nrncr Gro'u? (rigur>! A JlO I) irn;;'l; o'lcrvolta.gcs up
to 2000 \'ohs:"
.
-
2.
Add the folJo ....·ing rccol~'m~nc!cd 501ution to PolrtlI:
uIsol~lion n:i ays wilJ co! provideci in .. hI.! rroonitor lines (or VRSA
chnrmdlS 2. . nd Z1 to ?rev c nt ~Gui;}n,cr.t ci~rn.'gt! to the Pro&ran)mcr
<? ro.ui> (Fi:;\;rc A 1201) th.c <0 ove.vo1la~c.!> bdow 2000 voll·s . "
y
REASOi':
..
. OOA MAl 00;-.; EO leu o!' (:... l..:rl r·co. Ii, j ~j6o , ciirectcd· th;;.t an 2CP be
5ubmlttt:d.
The Ee? j:J to jHc·.. cnt Li. li:1C;1 7;\ciJ;:.,· vulncr;,biiii.y Iron)
the support bUl Ic~ rot:. vRS.':" cn.. nn.:::Js 26 ;.nd 27 ;..rt! uset! to n·.onito :­
cquipment in the su?port buildjr,g u:ld (I';':: ..vol t,,:;c .prot cc i. ion i< not prc ­
.
scntly provided fa T ove .. volla~cl:i uncle. 20CO volt ;; .
'.
,
.
...
. .
.
,
.
,.
. .
..
..
..
.
.
..
,
.
.
.
..
.
.
Shl. 1 of 1 .
,

Page 67

--
·1 -.
~:;: i' l :'i':' ..
;:':.£:e
~
;
1.'-'
1'. a. ~ ·..I ::! !~C \":;:
2) ~ - l':; E";l)~~ - .:' - .'" 1-:'
L<;"
~ v;: 1ti'i'!P5IT ~: 't; " :'Ll ~G ( .... JN~ 'II (j~:LY)
21:·1 -1.r.1·::-:)?-.~:- '1-4
:t..F .:' LCF" r ii'i-!:..;;r'l'£
(:\~.i.:t~;.:; (':HT~ if 0:-11.:0
2lJ.!- L:i~~}O.' - :1 - 1
I L!.l';;T~ .iT!:u r:·.:-!1','j
R
P-,lrOIl).(nt ·le. Fa,t j , ltC'l; .~:;- D[ ~-:":l ':.r !Lc: .:.F·.... ~(r)9!t) - 71..0,
cn!l.r. ~.!t$ ~nd/or
'
r~·.. !~i:l:'l."5 to
!.i';~ 5t>CYo:!
'i'·:"; !l :l~c·.l Or,!.,!"» !.o i:;~I)"p~.;1t<: l!:e e!'(ect~ '0 :'
thi~ !:t:1' ...·ill be 'v:co~p li.~hl·J .... i '.~.i;-; t!":.·'! r.cop:: of b~!O .lc Contnl.C~ - '7110.
I'::;~ll~.~'!e or" (.{:3 )ir~ct i "'e fo:- thb S,~p. .3~z·,ll
t:?n.:5ti~\:!.t: ~;.:!.hodt:t
fc. !' i:1":o :-p0:'l'ltior. of effo!c t 5 ,'If tni.:'i
C~;,l:1 . ·" i!1 thO! Dff ec.tej 'Jcchnicill
~; I:; \HtlS •
)'­
J .
'!'~.il" cr.~!!~~ C:"\~I :,'"
i r,l pl":::~~.• ~ci wi lh n? ill~t:rfuc:e effect on ~:;,s(lcll'lT. p.
r:(l r: t r:tc t"t' e1'.!:;':::o.!:l ~. d:-.J. ..·! r, !~:o; or .!l}C :;r..(>l: ~:l~ ilJn,
y. .
ItI!r.i.5!.n
1~r:C!:.> ll', 1'/ , r=. l? 'u:r.:l
.~~ '~';,id'l ;;,:-p. II-.Jt
c! 1 ~ckt:d (x) are
r.ot affC! c t;:.o·I ,
. I .
!:'! i ~ho:' h;'\;'d'oI:\!,"~ :"!.'!.i.:\b,DP.,'i no:-
th.:-
r:~lhhilit.v cC'n t.!)ct;llal· 5t.",t.Crr.~r!.t
is n![cct.er.. hy t.!1i . .5 c:h·-;n::I'.
~ .
~:'!"! ·"~\c~ol"'" ~: ' op~s.~~ try ("O:,;CIICt. 0. !-::it
... ("!'"ifio;;;'I:io!~ tit .:;TF lIT .
Thia
\Jill I"/oid 'I ci.:1,-;.::
~:'l t.h·.'
~!:!i'lc:-y of o;:cr."\"io:'l;tl l-:itu eX?cctc:1 t o
r.:'~ ul t
fr!') ~. a. kit. F,'c.ofi:.;:: ,
, .

Page 68

cot.'.uyr
1
Yi sut•e fi2ti3
3
1 4 Cab) e Aose.-atl.•t' Set,
5,
Protec.t..{.on
PftOPOSAL
81205
Cable. Set, I.•unchc:•
No Cha.ue-•
for tor Li for 26 '.v.-:d 2?
This renair•: the ot th••:. ochemat.ü•. dre.•aincs to
t. ?-.e nomencl-.'.'tre o: ft.:cte.4•.
1—62047
Zi-save?
21-üYi67
6
7
8
9
B.
5.
21-55757
b.a.—dvxr•: v; II
arrectea.
i lit •.•ré.hn.•• •eat-Jii:-ty e: the •€1 sure
cobles no:-
I tens if.
Hi feeted.
see .•Z?
at: ec•-ed Z.. , c.h=n€•.•.
1 A, •-•.hici:
1
a.•-e not ch..•cked (x) ore rct
e: ert.
None, the or 3. 0.243 has i'.ee•.i
11
ECP 11'/ 19
12
13

Page 69

r-
'! 1
""-------------,
,
c:l !"~ults.
'Ille I-:CL r~l '
ln~ ":':1br.e 7'"..'0"
;:-:::-.le l' (1x 101111 rt l:el' tr,e !;.~nDlng at. the RF1::E ~cd
'l'>f' the r:lcnlto;- c1n::I!ls 't ,:·
l · "! · ~s t aoll!ih t.h-:: t'or!"'clbtlo:1 or sc:natn.e ai.d tr.~nlt o r
re p..'rtl~e 55 dc!"l:-:('cl :1.,"\('1l'!r }:Ci-' 857
i~.
tnt e rc:hll n.g~~b ill ~.v : ; 'hc C':l:1f1 &U)ll t 1'.1n
':)~.
tl:~ r l;;u.e A 1317 Intcrc·:mnt"I'! t.in.s Bm:
rc:;ult.1:-te frlXl thts c t;:o nO! ;,01 ~ J. :"10 1'. he
1'.10:: conf.1S'o1I'3tl ons
of'the it~
.
tte.:::6 in linea Hi , 1"
18, "19 a~. 20 l.'hlo::h are n':lt cr.ecked (x) f!.~ not. effected..
I
_
j
I i
1_. ~_ ......... - _. _ _ _....._-_..._- _.. .-..--....._.-._- -··r. ---··_-_·_"':'_---.--------.'-- __ . _
i
i: ' ·:l. l · : ~· · ' ·,:. , ; "· '· "·' .I ·f
.
.
r X~ i""" ,
II','" .... . ' '' ,:
-.f'
, I
I ~ -..- .~ ;:;~:.'.~'~ .:~\:.~' .tc~)J~f~_~_'.::~._ -.:.-- - -'
"-;' !
'
~.,
" . ........ r.
""
~
~.
I
I
l
J I.. .. I' "I .j" .. ~ " ''''' .'~~
I .sec r.cr 11111 il
. j -
•.. ;:.~~I
..
' :.i " ( · · ~":. ·_ . --~. --­
:-::::\,"
~ · ,,!1. ',r,', ~I H ,·
·
' _I
I7 I
"
,
:.-
; 1:· r: : I ':. i- !I:·!,l.t:O!{i ~ '.J'~''' ':: 1.: .---.-
..---
-
- ­
L
I, .
I
j
.,," .' _
__ .. _. C._ .'-_ .. . ...--.-:-..- -.-'.- -- - - - -..- 1
1
L-__ ______
. . I
.-- ..---~
-
---
~---
---~_l
-----1
.,~~:=---.='::r c;" Her.,
CJ'·
. -------'
I
!I
. . .'
~ -i"i;::.;.,';:i,,'i~;.,>7,:<-,T-'----.-~-.-.-·-.--- . - ~- ..--.--- - . --.-- .~ -- -::'-.- - - ------­
.i 8 j),one, tho cevelo,""n' of Figure :. 13,( ,,.,, t "on· cOdp1otc,: :
i ;.i !t~:::;:i"i::T'\-iA-=;i:r;:::,':.;--- --- --. -.--- ----.-.-----...
-- -..-.---.--------,..- --..
9 ! l:Qne
I
.... ._---- ..---.-...-- ---_..-- -- ---- ..-..----- --.- . - - ­
1'l;7: t~ .•; 1;~:;;-I !iT;;!;':.:-, Y
10 1 .
.
I ', .f ·:- ' • . I : , .- .
... .. . ,...' .._.....------ ..----_.-_.-
---.- --'-- -- .--. -- . -­
n :' :.~·.::il I":;S: : ;.. -::: "" < !, ' ~'. I', r .... l :.... ; ,.,!.
I II See rep 1141, f'l:!.i;e
L
- ----- - ..-.--- ---.---- -- -- -----.--- ---------'----­
"'.((..\":il.~ .:. /l n:. :. ! ;jol ~ Il'i.." ;l
-_.- -------.---..--------"'c:_",,~I~'"
- _.. _.__._---------'­

Page 70

..
,,
·
,
..
· ,
"
,
,
..
,
·
·
" ,, ­
· , : ": .
,
,
,
,
"
,
·
,
.,
, . ,
,
, .'
,· ' "
,
"
,
.
rUM ""'~'( H.D .lor·;IH
V. ll
CHliliGE PROPOSAL
196{'~
1
THE BOflllG COllP~Hr
EIICIHEER/lIG
27 December
r .O. ~lJ~D
s~nH. W.lSM. '61U
(llOE 720
FACILITY
' ..... I
Io'rll t'IO lAIIAOW.VII AI
,,",c tOCt
~n1fM OUr (·H41ICti
1 1l(;;~·
0"
i![V .
(U ::~ ~: - .
I
2827
,
I'I SIJlA
.. ·
2
(O'lIUC lOA' S RICOIoU'i HOlO '1110;1 iT c=J ( ~(Rr,(HCT
c=JURClM
IT] .::oun lK
CJCOI,'P. Il~ lt lr Y
j
.....0"=" ,=
7.=·=oJ
Cfl"ll ~A(. II " O II(MHO ...... ( l.AIU~1
3 Launch Facility
.. .
..l
.
•
K.AIo( Of P"~I Oit {CMHI AHIMllT .Ameno
LaUD9h Facility Support Building
i
I
' I It( or (toe,U,C(
.
--- - . !
5
DC S~pplY for Isolation Relays . Vi1SA Channels 26 /;Iud 27 (LF)
,
-
-­
._---_.__....
c:nU II'I,rM0( CI","CI
,
.
Provide DC supply :for the isolation relays being installed in VP.'3A cha!tnels
26 cad 27 per ECP 1141.. A typical DC supply c1rcui t for t hese relay:" i"
f>h o'kTI on Attachment A Sketch 1.
•
~ :
"
,
..
.ADDI',rIOIlfIL DESCRIPIIO,{!
I
i
ji
!
In6t:ructions tor retest of VRSA Chennels 26 and 27 D:':.l for pc.::""t~ '~n e1. un:l 'it!!lj':'!)'
•
syatet:l sefety vill be required .
I
I
..
I
~
.
IU5 nrltA.1I0"l (Oil tK.l.sGt
IilQiJl Sno SY PI\OtIJ:t IIlGAC IIYIIT PI Rw,
'rhe isolation relays ere being installed in
FWG Meet ing <;0
"~~
56 I AIIMIU.'(NI .,
Vi1SA channels 26 end 27 per ECP 1141.
The
t.l.1U 29 Novelilber
DC po",;er required tor these relays is to be
supplied :trom tbe RPIE pover Syste!:l. This ,FCIR '
1 initiates the l:'equired RPIE change.
.
,
.
O{ViIOPIr{Io;'.l1 ;:(OUI;:(M{klS
-
& .lilA
Hl OlSlGS 1<:(0' 0
. Ye s
.\It THD
(IU/illl\'( ",OIlIII IViS ,
No alterDote solutions ore cODsidered feasible
,
..
9
,
..
i:~; '
..
.,
•
.;:"::(..
..
~ (().I.IIo{" Oi O rROIlU( 11(.Ii III 1f.lIVIIT
..
10
lilA
; '"
,
n 111M 11 0 (051 I O~ 114...,,(.( III ~ RO )lI{ IIOH
; .;:
"
II
lilA
"
' ,'
:-~..
~(( O ~W("'C>'I1t roli ', , (III: I(!~ottl
1.1
Retref1t, ;,:qu1red to provide wiring chS?ses fer isolation r elays to be 1Dstnlled
b '( EX:'O ]) I"
13
·~XFB:"f.F4~n·6~"!"6~ \"fJ.AFB, EAFBI MTAFDI IfAYIl, FL~AFD . Al.l Pl1gh •
II'QCk UP Alll{ I[O
HEl'F, "LFSB
On' 00""
,
\
~ . .::,' ,: '"'1111
·
---,­

Page 71

FEC? 528
Page Three
~'-
Itetil 16 -
EFFECT ON OPERATIONAL n/Fi..IOYMEh"'T
Service Life
This change, together ...·ith th~ associated LCP 1141, ....ill 1opro...c
service life of the VHSA chennels 26 and 27 by protcctinz the:'l fro~
de.n:age by overyoltBeC::; belc.... 2COO volts .
Ite r.! 19 - UTECT Oli LCGISTIC SUPPORT H.;TERIALS
Data/Publications
SAC-C~·!
VI-Tn
VAF3
11.A.F3
EAFi3
HTAFB
("G. I,II) we III,V)
2l-5:-!OOA-2-21
-1
-2
Po...·er G<!neratio:1
and Distribution
_J,
2l- 5:-!OOB-2-21
-5
-1
- 2
-3
Povcr Generation
end D1"strlbution
Item 20 - OTHER CONSIDEa<\TIONS
Interface
Tn1s is 8
c01!l~nlon facility change to Boeing ECP 1141.
IC'ftGA E026
records required ection steps .
L

Page 72

J.T1'Acm·ID;T A r.t:CP 528
"
,", .........
" ,
; ....
---,
MINU,TEMAN
FACILI TY CHANGE IN ITI ATI ON
REOU EST
I
-~
MeL . NO. '282.7
DATE
HCP NO. 5 28
I'~. " •• v.( O_lOl
Ol\'{.ltfUOIII til' H"",. "..· 0
II1U [ "(I>~~(D 0 1"[(' c<U( Q)
I, NTC · ·£tl LorI" t' 0
--,,
Boeing
no
31 Oct , 1966
15 Au,; _ 1967
YES [ZJ
NO 0
_J
SUBJECT @
!
DC Supply for I solation Rclnys - VRSA Channels 26 and 27 (LF)
-1
DESCRIPTION OF
CHA~:G E IUt .~~,IoC 'H So,l'$ If '( C~I H O I @
,
I '110(~ D",~'I .~ ) "(IVII I
I
Prov.ide DC s upply for the isolation relays being installed in VRSA channe l s
I
26 and 27 per E C P 1 14 l.
A typica l DC s u pply circui t {or these relays is
shown on Ske t c h 1.
i. I
,
,
-
,
-
-
-
JU5T1FICATIO!1
I WIl
' ~~1I0"- ' " ._eta "
~(C" '. U I (;)
The isolation relays are being installed in VRSA channels 26 and 2 7 pCI'
ECP 1141.
The DC power required for these relays is to be supplied from
the RPIE power system,
This F CIR initia.tes the required RPIE change.
,
,
-
ESTIMATED COST CD
4 )·3 e.t $11
= $44
}~t"l
1
TarAL = $'iT
DOCUMENTS AFF ECTED G)
"ECOMI.~ENDED EFFECTIVITY ' e
011;1.\\'1/>1('5
.H~
I'I' ':'U
I. a (0 ,...ur
(CH,. ,,,, ,
Wing I
All LFs
-
SPEC I' Ie :.T 101:S
Wing II
All LFs
Win'~ III
All LFs
M.lST!:R EOUI",.,.,EIH LIST
Wing V
All LFs
MAIW,I;LS
VAFB
All W133A LFs
nc . A AND f OR M C
Fig _ A 1377 and 1329
HETF
Vl133A LF
OTHER
l Ci':CA 5026 ,
l'/,;'" TV'I
III.l Us
I
e- :.JO"
"Lv'

Page 73

."
,
-
~I CL NO.
2.
Ok'
).~mnli
YEf.R
MINU TE MAI:
\'!=:APO;~ SY$TE I,1
DATE:
~9
!'O·:'.!:;,i~J er l~G?
F/,C ILITI ES \'JQ:1:Kll..:G GROUP
2B27
suf'Efc!iEO;::S
I SSUE
ACTIOI~ SHEET
OF:
3. THE PROPOSED FACILI T Y CH M :GE .S DES IGtU,T EO OY THE UC L r:UfI.GEn '" SLoer. I.
ABOVE
\'f~S
R£:V IEWEO AT fWG V. EE TI fiG 110.
90
ACT/ON TAKE/4 ON THIS
CII~"GE "::.5:
0,.
APPROVED AS WRIT TEII
[~h.
APPROVED WITH FOLLOWING CH/d;GES on
C O!.ti\~EN T S
03.
RETURHEO TO ORIG lt:.:.iOR:
AS I\OT JUSTIF IED:
FOR
0
0
AOQITlOrU.l JUST I FICATI01i
f OR fO LLOW ING AEASON:
The. F"wG
c l~_sSifie:i this Fe]? for des1:;:1 action .
A Rou:tin; priorit:r FEe? 528
'Will be sub:nitted to the CC:3 fo!' i'iti2.1 ::etel'i::!ination.
Her;'; wit~ !XP 1141 Gnd if
approved acco:uplish concu.:-::-e:1tly.
0
SKETCHES AT TACHED TO CHA!;GE ARE l.OEOUf,T[
TBD
[!]
SKETCHES "H ILL BE PP.Q'I1D ED BY THE AlE 0"
CLASS IFICATION OF CHANGE:: •• PRIORITY FOR CHMIGE:
8. FACI LI TY /I.r,EA
AFfECT ED:
I
liJ CLASS I
O 'ClASS 1I
rn L F
[] I.CF
o EUERG~I':CY 0 URGEUT o F:OUTINE
s.
INTER FACE AFfECTED'
7 . E5TII.I"'TEo COST f oll CtiA/HjE:
"
o S!.'S9 o OTHER
Lebo!' 4 ,.'3 e.t $11 = ~.44
0
YES
Hat'l
1
=
•• fACI LI TY AffECTEO:
Eep ACnOI~ REQUIRED:
0 "0
m7Fac
r.;-SB
0
'l"ES
0
" 0
EFfECTIV ITY fOR CHAUGE
. TO BE L.CCoMP LI SHED BY
TO BE L.CCOJ.; PLISHED GY .
BASE
CONSTRUCTIO!<l CONTRI'.CTQ:I
Dt.SE
ASSEf.lDLY Ar,D CHECKOUT CONTRACTOR
'''''FS
VA Fe
LF's 02-09
I
f----- .
Y!I ~IG I
WING I
All ?UChts
l.';AfB
UAFB
WING n
WINO n
All FliGhts
EAFB
EAFD
WltW TIl'
WIN:..im
All FliG:1ts
!..tTAFB
I!.T:"FIl
WING !l!:
WIt.;.3 rz
All Flight5
WAFS
V!AFD
WING Jr
\'(ING :2:
All }~1 ::".?;h',;s
FEWAFB
F EWAFB
VI WG :lZI
WI tiC 'YI
GFAFe
GfAFB
..
..
SQD!~ ZO
SQDI~ 20
. ,
l-lAfD
~.IAFB
•
ETF
Of
J,}:'sn
HAF8
HAFe

Page 74

HISTORY
3141ST STRATEGIC FISSILE WING
AND 3111ST COIG.QT GROU2
1 Oct
cember 1967
(Unclassifieä E)
Assigned to the
FIFTEENTH AIR FORE, STNEGIC • •
?emznently Stationed at
I.LQIXSTP,OM AIR FORCE BAE, GREAT FALLS, F:O.NTANA
WILLIAM D.
Historian
NÅ?'iOii, sgt,
JORN W. CAPROLL, Col, USE
Wing Commander
copy (1) 0? COPES

Page 75

~.~ ,
~-'-- .
.. '~
This volume i
cles~:i. !'i..ed"!II• , ••....
con.forw
. .
"'vo
t:>
of the informatioo "i
the source docuoents . It
handled in ac­
cordarice with the pr::>
ions of P2R 205-1,
info!".7!ation
the national dere~se
of the United States
the Es?ion~&e Laws (litle
18, U.S .C., sectio~s
01' revelation
of which in any man:1er to an
person is prohibited by
law.
T.'1is
o.... ncrc:.ding group 3, which is
the highest do",msrade
assigned \the information in the
source.documen;.cs
,
c historia~S .nalYSi~:d consolidation of in­
0
fOTQat1on from oooy sources, ~hich inQ~viaually may nave a lower
't,
dOWngrade:iViSiOnSJ results in a synthesis~·...hich may hao..e a ,·;ider
.
,.
imolicl n than toe •.aterial on which it is ~sed , Therefore, in­
di~iGWil downgrade instrJ.ctions for each p .. ragJ.~!l are not included,
end all portions of this volume \.-1.11 be handled u~Q.~r the overall
'\.
do-;..:ngr.;,ding group .
0:\
\

Page 76

.-,
-~-­
57
......--.
.•.
' . The remaining ban-\:: of batteries ....ere removed i'refit the LCF
on 10 Oct-=:.ber and replc.ced ...."ith n8;'" batteries on lL Octnber. The
LCF was exatrined and fou~d to be in operational status and r:as
brought' back to alert st.tus on 15 Octo~er . The inve3tigation of
5
i:.
the incident could not discover the cause of the incident j but it .
~
was believed to be a freak. incident. 91 (~
i ;,
t
iiISSl LE n:CIDENTS - Echo Flight Testi ng
; ,t
In direct relation to the Echo Flight incident as covered in
the April - June 1967 History of the .3Llst S?1H
"'as the Electro
,
~.
liagnetic Pulse (E?1P) testing conducted thr::lughout the quarter.
!',.
The EHP tests ...:ere cone:..:.cted by SA.HSO, l ater j,oined in the testing
,'.
I
by the Boeing Com.pany. 'rhe EN? tes ts by SAI'ISO and Boeing were to
,
~
discover the ',le~k spots i n the different tj'PC of Hinu.te~an con­
figerations "n.thin the Zi{? field. i':henever a ...:eak or f£ulty area
"'12.S found~ an ECP '",as to be initiated to correct tile discrepancy,
or elir:rioate it. 92 (I)
The ENP tc sts ",'ere conducted at IF Si€rr2.- 39 of the 564~h
s~.s . The tests ....ere scheduled to lest until mid-Jarr.lary 1968, but
could ee extended if there ...ere still apparent problcr.'l areas to
investig2.te . The primarj rt"ason for the Boeing tests ..~re to de­
ter.:tine :El1P a.ffects on the Real Property Installed Rquipr.lent
(RPIE) of the Hinutem2.o sites , During the tests l various voltages
or 'electricity ...:ere inserted int':l the equip::!ent on the site to
91.  Taken from the files of TADI 2u Vct 67 1 by Set \'lillian D,
lJapton, \',;ing Hisbrian.
92 .
Intervieri, Sgt \"li lliam D. Napton, '-line: Historina, 'hi. th Lt.
Col E . Coldwater,
6 Feb 68.
II
CX!:-:
68 , 3

Page 77

58
..
si~late a" lightening strike, and observe the effect·o! this Sl. ...­
uation on the various eQuipment .93 . (I)
O~e of the pTi~ary theorfs of the Echo Flight incident was
connected ......ith s~lI'.e type of adverse pOlier effect. All test con-
due ted toward this end. pro·,.red necative result:s . The E?-lP .tests at
S1erra-39 Here considered t~ be the final series of tests in this
9L
a.re.a . t
Personnel of the Air ~orce S~ecial Weapons Com~~nd, Kirkland
AFB, New He.xico, joined SP11SO and Boeing personnel in observing
the E!-tP tests frol:l 14 !~ove mber thrO'.lgh 15 December. The Sylvania
Electronic Co:;;pany also sent representative's t::> the site to 015­
cuss the field of lig~tening effects and E!-iP. Due tb t.he interest
&enerated by the EHP tests it .....as estiClated they ...:ould be carried
.
95
on into rnid-1968 .
~
SUPPORT -
TRP.NSP.JRTATION
}ialmstro;;'l had 696 vehicles c.llthoriz,cd and 918 vehicles assign­
ed during the quarter. "Snpport of Force Nodernization cau.5ed the
c'... erage in assigned vehicles. The averag,e r.lonthly ~illage of the
3Llst TR'-Ns alone ,,"as approxiaatelly 580,000 !:Iiles. COmbined with
t.~e other units that ',.iere invcl.... ed in vehicle tr2.nsp:lrtation, the
93.
Inter-vie·.... , Sr;t "Killiam D. Napton, lVing Historian, ·..nth Lt .
Col. E. Cold...iater, SATJ.F Engineer, 6 Feb 63.
94.
Ibid.
95. Ibid . "
3
" ".,
, J ,
!

Page 78

vzczclEÅ'jez.,
.'.ZJAZ
MAR
•AFB
AiER.7JCAN AVAiT AVTONF.TICS•
AFLC
,AFB curr
12 G?
$SAC/DMTB, DE;
15AF/DNOC:,
iDOt.iiNGéMINUTENAN•
ESDS'BSS*;
WRIGhT AFB i.1C'..iC
FLIGhT.
•$T'Å•sk• COY.Etf'.D CT OOM.':A MARCH.
AND •
É.3..4.!t•
vet"

Page 79

ar.iEQUATE•
A QF AVAILA>LE
Y.Z Cl}RRF.xj.'L't
E.x•cst SUC}i AS
A TEST: P.N
wr.i,;. R3PRCbüCE
AF?ER. OF TEST PROCEZDY.:€G'
AT I:.IT.LL CONVE!E
01.4 A TEST. p;..h'sé
C)3TAIN4.N
iJF:öN TIE,
Q? i,'.cfto
THIS ' Tib'*E

Page 80

FEC.
67
XCS .±iAiE.t:'.; CALIF
AFL(.: onto
RÜWJAB»/bS!)
r..tONS 57
ZE; zoz.T.ts;e• (D. J:
ZDcol•- I
MORRISON); BSD.'BSS2
BSQR,• BSc.ii
SUBJECT \ i, F.
A TASK GROUP COWEöED AT cog.i';A 28 MARCH
REVIEW .THE. EP.SULTS TO REPRES.EüTATiVES
15TH
.it•:. Is TE POSITION QF T THAT DATA EXISTS

Page 81

to RESU.iiE
TO
TASKS
2 DATA• STRONGLY
... iw..z..
F.tr .J.s NOT t',
.•..T THAT
•til}.l. TF- 3E
i,F.ftS? j
30 c.•F 3Y REPRESENTATIVES.
33.VEiSJP '.,F FROM SYSTElVJ9 ALLOWS
FOR APä.Y.eaTION NC-GO AT LF
i.EVELø• AFTER SuCu TäST AS REQUIRED TO •TEST/
•CR ANA!.YZE I,.T •CFS. CONVENE AT BOEING*
SEATTLE. APRIL. A PROCEDURES; SUCH PLAN
w.7.1.i., IF: PROCEDURES,
FLAN wiLi. RECEIVF,Z
SAFETY}
COORDINATED sac .AS.
TIE .OT 5
AT FACILITY
ARE PROCESS„. AND
1.5 11B. TO •n.tvA
NCVP.•3 AFTER
i.T.S Fg•.ü.üPT.
FifiiOD OF six
sj{.7.äT
s.;.F.Xi-Afi TO
FURTHER ADVISED
BE OF

Page 82

$9 95
341st Sti•ÄfizC2C .u,iSSIE•
341st CC..S.%T
. "Y — 31 i•'.arch i 968
tie )
cX/h/- 7
18th Strategic iterospzce Division, 15th Air Force,
;-å:• ?orc 2;se, Great F •
33
St.retegic hir Cox-mand
Eänte.2
set, VSkF
Wing li.istorian
Colonel, USSF
Ccr,.mander
copy 1 CC?ES.
C X IH 681: 7

Page 83

.
~
(u)
,
S.J:;CU:H:ITY STAT"Lt·Zt.T
r.e is classified..lliillllJ
conform to
of il}-""H 205- 1,
This vol\.!Ji".e
in! Tmation effecting the n~aning
the clas­
sification of the
It will be
handled in
as rur.ended .
(U)
of the .l!:spionu,5e l,al':s (. ~~e.; 1 ; U.S .C., sections 793 i':.nd ',94.),
the trcnsmission or
to any un­
reV~la';t'tof .,hieh in any 'm""ner
.uthorizeri person is ~I'OIIi\,\ by 10",
(U)
This volur.,e lJ1:i5 beefii.:;.:J·acea i.'1 dcwnUNdinr:; Croup 3,
,,:hich is the hiEhest.f<,:'ngredin~rOUp c.!Ssig,ncd to the information
,i'
t..
in the !Source doc'2tr(lnts .
The hise~"rian I 5
<U1~lysi:s and consolici.ation
'~ ,
"
of infOrr.iC!.tion fJ.(T;t ;r:;,;.ny sClurcc:!S) ~:h- : h indivicuallY mC!.y have lo;.,"er
~
\
,
do:'mgr<".tie
~ro;(fi::;icr.!;, results :in a synw.esis ~·.:hich may ha'IJe wic.er
.
'f
~
implicatioJl1 than the ;r.atel'ial on ",,"hich'i?t is based. Therefore,
i..'1diVicct cio~mgr....c!e instructior:3 for
are not in-
y
diC~J ~nd all porticns of this
be handled under
},
l!e.1'
overall dc~mbr"'Gine gl·OUp.
,,
..;• ,
\
'- .
'" .
\.
~ i
., ­
" .0 ". _. _
__ _ •
-".1:

Page 84

59
there ..:as a pa";el' tr...ns!er . r:eadqu~rters J 15th hF orecr ed i:i tes t
to deteri,;ine if the cnanr.el 20 l:'i,~ bei!l!!; cc.:.useci by noise or a
ph<..se
se~ue: , ce problem . li' f.'j~ase rel.:.tion '.,'-':'5 tt~. preble;:;,
ccul.c:i po:;::;ibly c;.iJ; af,f! beth the meier £encrater ana the C"':".(; r:ooler
cor,:prcsser wlit . The test ',:as to cov~r such it£I;'~; .:.s C'UTc.::1t
poNer ana the 206 VOl.t, to ili!rtz. (cYC.LCS p<::l' secor-d) mot·or
f6
t
•. .a.t th
;;.~ ,e
l' tn' e ."o·
_ .·
·r""'-',.s,·er.
gen~ril or ou ...put.
.e
.
0
·.·er ...
(u)
;. n.ecting on t!\e Vic";A
ch<,m~el ~ o.l..al';: ;.;.nc. c.ircct
currcint to <!lternating c~rrcnt. }.:l"oiJlem. :·:as held .::.t 5•.I::;U l';cad­
:.;.uarter:>, ~;orton AFD, Cali fornia, on ':!.7 Ft:bru:;.r.l . Field tests
,·;ere rel!.t:i:red before Cli!j' con'ectivt! c..ction COl!l.Ci ce !')J.i:.!1,.ea ho....­
ever . '1'he 341st uC[!" ar:a. the 13oeili!; Loo:p.:any cor.c:ucted a joint
study t o deter.:ine the rre;..ue~c: C!' the cho:!.;~ ;cl £0 iil;~ r;;;s by
site, ana by t. ::;.te , with c:.il re];.\te<: l.:c.ltcri<!1. The t~!'ts \·:ero
begun in lc..tc February an~ contim.:.e .. thr-ou[;h to the end of the
L:u;;,.rter . 87
(u)
In direct rej,.:. tion to a~ incit:(mt cover.;:d in the "'-pril-
June
j ~7 hi::;tory of the 341st S;·:~i ',;as t.~e £;lec~ro-l·i i.~gnetic Fulse
86 .
:-:sf; dtt 22:15OOZ, 15r.F(J)J'(::i) t o 3!.lSJ.:,;J(DI,l:L Sdlj : Ch;:'(lr.el 20,
2:2 Jan 68 .
67.
r.s£ , dtg 202j.<:6Z, 51l.LSO to ;'J... 1Z!·n~'(DLj,). ::ubj: Vi1Sh chanr.el 20
.cu-:.d vc to i;.e POl':e:r 'i'r':j]sfer rrCoblem 1 28 Feb Co8.
-.
,-.

Page 85

.a,0
(EHP) testlne conducted by SJ.l·;SC: the Boeing Co;apilny ilnd the 341st
Sj.;l<j il.t site Siel"r2.-39 of tht: 56Uh Sj.;S . 'fhe criginc.l tests "'ere
termj.n.::.ted cn 9 J<lm':i:.ry,
;;:J~d the site \-:2.5 returned to the \·iing.
Due to a G&C chunge, the s.itc: di'::' not resume 'llert ::osture
86
J.::.nu<.iry .
(U)
1\';0 Ti!t!<3 Cc;;,pli.l .. ce 'iechnic.:!l OrG.er~ (T. l .. T. O. ) cu:.:e
from the E::·jp testing . One ',;2 3 fer the aGditicn of .l!J.:r pube suppres­
sion to iF j.ntercorl!i':!ctil1,f bCj:es to el:L-in....tc the ~frect of
ened  Intersito fablei5 . 'Inc ~ecc~d ',:<is the :!cciition of VES,;. mc:'l­
,
itor lin~ protection relc.;ys to the i.nterc0I"!nectin~ bo.:'(cz to prc­
vent e'i.uipr.ent Oi.ilT.<.!.gc ~d/or f;;.ilure fraIT. overvoltages bel oi';
2000 volts . The b:o T.t.T. O.s ',:erc t o .::.c<.;or.lp:t.i:!r.ec ccnclllTE:ntly,
The second of the T.C.T.O . s ";2.:! ;iot releh.5CQ 1.!!ltil 27 H<.:.rch, ..nd
<9
..:ork  t:i.lS not st.;..rtec b,y thil end 01 the qu,;:rter, '
(u)
I, SUJr,,-ner...uS 1:.1'.P :Jl'ogra.,,:; .,'as fichec.ulecl to begin 1 -"pr1l
a.t site Inciia.-6 of t::c 12'th s~:s, Ho~':e\'~r, Q'.te to cont.:-;!ctu<=.l pro­
blc:r.:s a!'soci,tted \'!ith the t'C~t !=-!"CeTo.'T'1 ti1t:! c<.:.tc ter the stt!tt of
the y ro£l.'~' ::l slipped to 1 June 1 76f':. The ;,rOETi.:;jj '.'I,;S to l .. st for
0-(>
on ~ ~'c ~: r
, '
as.  LtT}
~,1.1SI,.\'.t(l.iCHi~) to 15,\F(lJCR), o.ubj: Unit ?rogre:;sJ .3 1 Jan
c8 . Ex 38 _
89 .  Fublic;...tion, U;-.inuLeli:an SCI'Vice i.C~,jSI1, I ~ sue 36, .;'an- Feb 68 .
90 ,  H:sg, citE; 162.323Z, S"C(DFLD) to 341S!,:h'(DCI'~), sl.l.bj : SU.'T;::er EM?
Pro£r':';'T' ~1 16 r~':l '6'8.

Page 86

.. _._--­
DEPARTMENT OF THE AIR FORCE
'Headquarters 341st Strategic Missile Wing (SAC)
Malmstrom Air force Base, Mon~ana, 59402
:0
. 7:  BellM
31 January 1968
;1.'1:  Unit Prog;ess Report (RCS: SAC - U89)
SAC Progr~mminq Plan .12-66, LGM 30F (Minuteman) Force Modernization
Program I Malmstrom AFB
Month Ending 31 ranuary 1968
0: ISAF (OCR)
1. Commander' s Comments: The LGM 30F (Minuteman) Force Modernization
Program is on sChedule In the 341st Strategic Missile Wing.
\
2.  Status Summaries:
a .  Personnel: All tasks will be accomplished on schedule.
b .  Operations and Training: All tasks will be accomplis hed on schedule.
c.  Gommunicatioqs: All tasks will be 2ccompl1shed on schedule .
•
d . . Maintenance:
' . .
,
,
. (a) The programmed ATC formal technical retraining of
twenty officers and two hundred and seventy-eight technicians 1n Force
Modernization (WSI33A-M 5 1'stem) is on schedule . During Ja.nua.ry,
two ATC Travel Team Courses \\'ere completed . Forty members completed
Course ADF 44370G-4 (Missile Maint. Technician/A -M) and forty
officers and key noncommissioned officers completed Course ODr 3124G -2
(WSI33A-M Supervisors ' and Planners familiarization course). The
,:omple tions of Travel Team Courses included thirty personnel who were
;,ot originally scheduled in the program. During this report period, the
inputs into ATC technical course s at Chanute AFB were resumed, after a
scheduled "break" for Christmas and New Year hoUdays. Eight members
departed fOr Course AZR 31670G-3, Msl analyst, (Tergeting) A-M; three
to Course AZR 31672G, Electronics Technician; four to Course PZR 31670G
-4, M s l Analys.t (TEAT) A-~1 and one officer entered tra1ning in Course
OZR 2825-4·, TEA~ OE~cer, A-M. As of 31 Jan 68,
248 members of the
341SMW ,had completed th .~ir technical retraining for maihtenance· support
of the Force Modernized· flight.

Page 87

, ," .
": ~ ..
. ,
'o\ ,l ; '. 1 '
-~ i .: .
(b) The program to provide the initial Force Modernization
retrained mobile teams has been completed, as previously reported. As
of 31 January 1968, the 341SM'¥V expects to have fifteen electro-mechanical
teams, eight missile maintenance t~ams and eight combat targeting teams
Force Modernization retrained . The on-base launch facility trainer has
continued to be used effectively for training of missile maintenance teams
and combat targeting teams. Site India - 10 was approved .as. the 341SM\V
off-base Electro-Mechanical Team trainer during January . It will be utilize,
to the maximum possible· extent to assure·an optimum capability in the EM!
support area. The on-base LF trainer was converted to the WS133-B con­
figuration on 5 Jan 68, to fulfill the immediate training needs f<:>r Wing.V!
mobile teams.
(c) The T-20 Control Monitor Trainer has been removed from
the On-Base LF Trainer for necessary modifications .. It is at the Autonetics
Company, McAlester, Olda. The training tasks which would normally re ­
quire the equipment are being accomplished at the·Classroom Control
Monitor Trainer, ~-19, located in the 34lMIMS Hangar. No problems. are
anticipated in fulfilling ocr training requirements.
(d) The T-15 Control Monitor Trainer, applicable to WS133B
(Wing VI) training-./is at the Autonetics Company, Anaheim; California,
being modified. ,It is scheduled ior return to Malmstrom AFB by 27 iun 68.
(e) The WSl33A (Wing I) off-base launch facility trainer,
Alpha - ll,wllI be continued as a prof iciency t rainer and team evaluation
facility, until Mar 68. After that date, training and evaluations for WS13JA
mobile maintenance teams will be .accomplished in conjunction with EWO
dispatches . .
(2)
Program:
(C'!)
Golf Flight at 341SM\V is scheduled to be repostured on
?G jan 68.
.,
(b) Juliet Flight is scheduled to be depostured on 30 and
31 jan 68.
(c) The Electro-Magnetic Pulse (EMP) Lightning Test on Site
Sierra - 39 was completed and the site returned to SAC on 9 Ja n 68. Pos­
turIng of the site begen on 10 Jen 60; however, due to a Guidance:llnd
Control Package problem, posturing was not. completed until. 14 Jan 68.
2

Page 88

(d) The Flight Command, Interrogation and Status Test
Demonstration M2-1, Security System, Power System, SIN and VRSA Tests
Demonstration M2 - 2 and Launch and Launch Enable System Test Demon­
stration M2-3 were scheduled for accomplishment at Site Golf - 1 on 20
and 22 jan- 68,
e . . Facilities:
(1) "In-House" work on removal of obstacles for helicopter landing
pads has been discontinued because of snow and cold weather .
Resumotlon
of this work at C-7 is tentatively scheduled fbr 7 February 1968 . . Work also
remains tO ,be accomplished at C - 3 and N-4. Obstacle removal has been
cc;npleted at G-9, D-3. N-l, C - l and N- IO.
(2) Drafting of the hellcopter landing approech plates for Launch
itcllitles has been temporarily discontinued at the suggestion of Head ­
quarters 15th Air Force, with 75% completion, until they determine standard
I:riter!a for these plates for all missile bases. Currently available approach
p!ates are .adequatl7 for interim operational use.
Soft Spots:  N9ne
Problems/DeficienCies Recuirlng Hiaher Headcuarters Action: None
Copies to:  lSAD(DEXO)-3, C-2,DCO - 6
DCM - 4, DS - l, MS-l, BC-2,
BP - 2, 8CE-2, CSUP- 2, BSV-I,
80 -2, BCR- l, TSC -I, CX! -4,
DCA-I
"

Record

Author / institution
USAF 341st Strategic Missile Wing, archived by The Black Vault
Date
1967; FOIA release
Source type
Contemporaneous government document
Used for
Echo Flight shutdown; official response to UFO rumors
Limitations
Archive summary secondary; download and review primary PDF for exact quotations

Also cited as (1)

The same document appears under these IDs in the workbook. Links to them open this page.

  • SRC-V81-08 Malmstrom declassified unit histories
    Used for: CASE-031 Echo Flight

Link

https://www.theblackvault.com/documentarchive/ufo-case-malmstrom-afb-ufomissile-incident-march-16-1967/